Page 342 - GM E-Booklet Dec-2022
P. 342
STATION: FM KMS: 14.54 Category : SG-3
I. STAFF STRENGTH II.(a).BUILDING-RESIDENTIAL
Group C/D Available Staff Strength
Type I II III IV Total
Group C 18
Group D 9 Available - - - - -
Total 27
III. WATER SUPPLY ARRANGEMENTS II.(b).BUILDING- SERVICE
Total Demand (Lts) 249000 Station Building 1
i. Domestic (Lts) - Goods Shed 1
ii. Service Building (Lts) 249000 Test Room 1
IV.PASSENGER AMENITIES
2nd Class 130
1.Waiting Hall (in Sqm) 6. Taps 21
1st Class -
PF. No.1 665
2.Platform Shelter(in Sqm) 7.Lavatories/Urinals 8/10
PF. No.2&3 911
PF. No.1 373
3.Platform Length (in Meters) 8. Water Coolers 2
PF. No.2&3 413
4. Seats No's 100 9. Foot Over Bridge 1
5. Vending Stall No's 1 10. Shady Trees 10
V.PASSENGER DETAILS
i. Number of Passengers dealt per day (Nos.) 3738
ii. Average Earnings of the station per day (Rs. In Lakhs) 0.72
2021-22 2022-23
VI. EARNINGS OF THE STATION 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
1. Passengers 40329223 9289549 4087231 17345684
2. Parcels - - - -
3. Goods 6156131 1722377 1722377 -
VII. LOADING/UNLOADING
2021-22 2022-23
A.Loading -Outward 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
No.Of Wagons 660 21 21 0
Tonnage 40848 1335 1335 0
Commodity RMC (Ballast), Cotton Bales
2021-22 2022-23
B. Unloading - Inward 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity - - - -