Page 350 - GM E-Booklet Dec-2022
P. 350
STATION: MXT KMS: 08.87 Category : SG-3
I. STAFF STRENGTH II.(a).BUILDING-RESIDENTIAL
Group C/D Available Staff Strength
Type I II III IV Total
Group C -
Group D - Available - - - - -
Total -
III. WATER SUPPLY ARRANGEMENTS II.(b).BUILDING- SERVICE
Total Demand (Lts) 243000 Station Building 1
i. Domestic (Lts) - PWI office -
ii. Service Building (Lts) 243000 Relay Room -
IV.PASSENGER AMENITIES
2nd Class 30
1.Waiting Hall (in Sqm) 6. Taps 25
1st Class -
PF. No.1 796
2.Platform Shelter(in Sqm) 7.Lavatories/Urinals 8/8
PF. No.2 1010
PF. No.1 420
3.Platform Length (in Meters) 8. Water Coolers 1
PF. No.2 420
4. Seats No's 149 9. Foot Over Bridge 1
5. Vending Stall No's - 10. Shady Trees 28
V.PASSENGER DETAILS
i. Number of Passengers dealt per day (Nos.) 2297
ii. Average Earnings of the station per day (Rs. In Lakhs) 0.45
2021-22 2022-23
VI. EARNINGS OF THE STATION 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
1. Passengers 27903685 5939949 2378084 10881470
2. Parcels - - - -
3. Goods - - - -
VII. LOADING/UNLOADING
2021-22 2022-23
A.Loading -Outward 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity - - - -
2021-22 2022-23
B. Unloading - Inward 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity - - - -