Page 238 - GM's Annual Inspection Booklet DEC- 2022
P. 238
I. General
HYB division has Multiple Aspect Colour Light Signal with LED based Signals. All the stations are
provided with Integrated Power Supply (IPS) and Dataloggers networked to Divisional and Zonal HQrs.
On Telecom side the division has 100% 6 Quad underground cables for communication. OFC provided
in the entire division except MJF BP – MLY GC section.
II. Key information of S&T department
Type of Signaling
MACLS with Panel and EI : 59(PI-41& EI-18)
a. Standard III® : 06(TMX,SHNR,BABR,UR,BDVL&FM)
b. Standard III (as per New SEM) : 03 (GLY,JCL& DTP)
c. Standard II® : 47
d. Standard I : 03(BDHN,GJWL & MDAK)
Type of block working
Absolute Block Sections : 50
a. Single line Token less Block Sections : 15
b. Single line UFSBI with BPAC : 28
Double line UFSBI with BPAC :
c. 06
Built in EI block interface :
d. 01
Automatic Block Sections : 09
L.C. Gates
a. Total Manned Gates : 117
b. Total Interlocked gates : 70
c. Mid-Section Interlocked gates : 34
d. Station Section Interlocked Gates : 36
e. Sliding Type Boom at Interlocked gates : 70 (Tfc -36 & Engg-34)
f. Electrically Operated Lifting Barriers : 30 (Tfc-20& Engg-10)
g. Mechanically Operated Lifting Barriers : 40 (Tfc-16& Engg-24)
Power Supply Arrangement
a. Full IPS : 59
b. Mini IPS : 45
c. Solar Panels at Stations : 11
d. Solar Panels at LC gates : 33
Data Loggers
a. Stations/Cabin : 59
b. LC gates/ Auto Sections/Huts : 74 (RTUs)
COA with Data Loggers : 13 (Efftronics-10 & Sirveen-03)
[[[
Kavach
a. Deployed Km : 536
b. Stations : 56
c. LCs : 06
236