2    145           ROB between Dichpally -              2012-13     Foundation design submitted to
                                 Nizamabad two lane in lieu of LC                 HQrs on 18.11.2022, under proof
                                 No 193                                           check.Joint inspection/relocation of
                                                                                  S&T and Telecom cable conducted
                                                                                  on 23.11.2022.
                                                                                  To take up the foundation work S&T
                                                                                  cable to be shifted.
                                                                                  TDC - Oct 2023.
              3    220           ROB between Gundla                   2017-18     Combined  estimate  preparation  is
                                 Pochampally - Medchal four lane                  pending  due  to  non-receipt  of
                                 in lieu of LC No 246/A                           approach estimate from State Govt.
                                                                                  State   Govt.   has   been    again
                                                                                  requested  on  28.11.2022  to  submit
                                                                                  their portion of estimate.
              4    192           ROB between Mahboobnagar -           2016-17     State Govt    is   finalising    the
                                 Manyamkonda in lieu of LC No 60                  alignment  plan  and  will   submit  to
                                                                                  Rly shortly, as per their letter dated
                                                                                  17.11.2022.
              5    234           ROB between Falaknuma -              2018-19     Tender  opened  on  28.10.2022  and
                                 Budvel four lane in lieu of LC No 7              under finalisation.
                                                                                  Permission to HMWSSB for shifting
                                                                                  their  water  supply  line  in  Railway
                                                                                  area is under process.
              6    232           ROB between Timmapur -               2018-19     State  Government  given  initial
                                 Shadnagar four lane in lieu of LC                approval of GAD on 22.11.2022 and
                                 No 27                                            submitted  to  Division  for  review.
                                                                                  Estimate under preparation.
              7    238c          Proposed ROB as 1x46.00M clear       2019-20     Alignment  plan received from  State
                                 span composite steel girder at Km                Govt  in  July  2022.  GAD  under
                                 166/500-600 in lieu of Existing                  preparation.
                                 Manned LCNo.90A between
                                 Wanaparthy road and
                                 Sriramnagar stations.
              8    238d          Sec-bad-Mudkhed- ROB in lieu of      2019-20     Alignment   submitted    by   State
                                 LC 228  Wadiyaram Yard-                          Government (July 2022).
                                 Masaipet at  Km 555/3-4.                         GAD prepared and submitted to Div
                                                                                  (23.11.2022) for initial comments.
              9    238f          Sec-bad-Mudkhed- ROB @ LC            2019-20     Joint  inspection  conducted    with
                                 No.250 (Bolarum Yard) - Cavalry                  HRDCL  authorities  on  29.11.2022
                                 barrack.                                         for  fixing  up  alignment  plan  for
                                                                                  preparation of GAD.
             10    238g          Sec-bad-Mudkhed-ROB @ LC             2019-20     Soil particulars and trial pit details to
                                 No.209 A uppalvai-Kamaredddi                     be  incorporated  in  GAD.  Boring  to
                                                                                  collect  Soil  particulars  completed
                                                                                  (22.11.2022)  and  details  are  being
                                                                                  incorporated    in   GAD,     under
                                                                                  progress.

             11    238h          Jankampet-Bodhan- ROB @ LC           2019-20     GAD  under  revision,  as  submitted
                                 No. 12JB at km 12/5-6                            by   construction   having    some
                                                                                  infringement   issue    for   future
                                                                                  doubling/tripling.