Page 282 - GM's Annual Inspection Booklet DEC- 2022
P. 282
STATION: PDNA KMS: 202.65 Category : HG-3
I. STAFF STRENGTH II.(a).BUILDING-RESIDENTIAL
Group C/D Available Staff Strength
Type I II III IV Total
Group C 0
Group D 0 Available - - - - -
Total 0
III. WATER SUPPLY ARRANGEMENTS II.(b).BUILDING- SERVICE
Total Demand (Lts) 1500 Station Building 1
i. Domestic (Lts) - PWI office -
ii. Service Building (Lts) 1500 Relay Room -
IV.PASSENGER AMENITIES
2nd Class 12
1.Waiting Hall (in Sqm) 6. Taps 1
1st Class -
PF. No.1 60
2.Platform Shelter(in Sqm) 7.Lavatories/Urinals 2
PF. No.2 -
PF. No.1 180
3.Platform Length (in Meters) 8. ShadyTrees 9
PF. No.2 -
4. Seats No's 38 9. Foot Over Bridge 0
5. Vending Stall No's - - -
V.PASSENGER DETAILS
i. Number of Passengers dealt per day (Nos.) 9
ii. Average Earnings of the station per day (Rs. In Lakhs) 0.004
2021-22 2022-23
VI. EARNINGS OF THE STATION 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
1. Passengers 0 0 0 92250
2. Parcels - - - -
3. Goods - - - -
VII. LOADING/UNLOADING
2021-22 2022-23
A.Loading -Outward 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity - - - -
2021-22 2022-23
B. Unloading - Inward 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity - - - -