PLAN HEAD - 2900 (RSW / LEVEL CROSSINGS)
          SN PH PROJECT  PH Y-o-S PB   Short Name of Work            Alloc.  Last Sanc  Exp. upto  Exp.   Exp.   Anti.   Est.   %age  REMARKS    Status
             SN ID             Item                                       Cost  March   during   upto   TDC of   Status  Phy.
                               (PB,LB,                                                                     prog
                               DRM)                                             '22   2022-  date  Rly     of Rly
                                                                                      2023      portion
           9  1 11.03.29.18. 29 2018- -  Hyderabad division : improvements to Level   S.Fund 15851  18234  0  18234 31/03/  RE under   85 work is in progress at NI- LC gates  TDC 31/03/2023  WIP
                                                                                                     prep.
               4.52.005    2019    Crossing Gates Section.                                      2023
          10  2 11.03.29.19. 29 2019- LB-  MUE-SC-DHNE, JKM-BDHN & GWD-RC -   S.Fund 34334  22609  1049  23658 31/03/  Det. Est.   20 Work in progress. TDC 31/03/2023  WIP
               3.52.001    2020 60  Improvements to gate lodges,                                2023  Sanc.
                                   Construction/Improvements to toilets, water supply
                                   arrangements at gate lodges,
          11  3 11.03.29.19. 29 2019- -  Hyderabad division - Provision of smart real time   S.Fund 7489  4865  0  4865  31/03/  Det. Est.   35 Work Temporerly kept under abeyance. TDC   WIP
               4.52.001    2020    gate position and auto PN system at non-                     2023  Sanc.   31/03/2023
                                   interlocked LCs.
          12  4 11.03.29.20. 29 2020- LB-  Hyderabad Division-Interlocking of LC gate   S.Fund 7148  3744  992  4736  31/12/  Det. Est.   98 Work physically completed. Final bill under   PHC
               3.52.001    2021 63  No.189A at Km 448/8-9 between NVT-JKM                       2022  Sanc.   process.TDC = 31.12.2022.LOA issued on   (FuP)
                                   stations.                                                                  30.11.2020
          13  5 11.03.29.21. 29 2021- -  SC-DHNE Section: Replacement of Mechanical   S.Fund 14772  0  1933  1933  30/06/  Det. Est.   20 LC 73 commissioned on 08.09.2022.Remaining   WIP
               4.52.001    2022    operated Lifting barrier with Electrical operated            2023  Sanc.   gates,work is under process. TDC: 31/03/2023. LOA
                                   lifting barrier at 5 interlocked LC gates (Traffi                          issued on 05.03.2022
          14  6 11.03.29.21. 29 2021- -  Hyderabad Division Rehabilitation of worn out   S.Fund 4616  0  4108  4108  30/06/  Det. Est.   80 Out of 10 LC gates 04 gates (LC 60,61,219 & 228) are  WIP
                                                                                                     Sanc.
               4.52.002    2022    Interlocked LC gate lifting barriers                         2023          completed.Remaining gates work under progress.
                                                                                                              TDC: 31/03/2023. LOA issued on 05.03.2022
          15  7 11.03.29.21. 29 2021- -  Replacement of Mechanical operated Lifting barrier  S.Fund 14772  619  1587  2206  30/06/  Det. Est.   0  LC gate No. 192 & 172 are commissioned.   WIP
                                                                                                     Sanc.
               4.52.003    2022    with Electrical operated lifting barrier at 5                2023          Remaining 3 gates work under progress. TDC:
                                   interlocked LC gates (Traffic) on SC-MUE Sect                              31.03.2023. LOA issued on 05.03.2022.
          16  8 11.03.29.22. 29 2022- -  SC-MUE Sec: Widening of road width, Re-arranging  S.Fund 0  0  0  31/03/  DE under   0  Detailed estimate under process.  EST
               3.52.001    2023    of Booms & Improvements to Road Surface at LC                2024  prep.
                                   Gates Under ADEN/MED Section.
          17  9 11.03.29.22. 29 2022- -  SC-DHNE Sec: Widening of road width, Re-  S.Fund 0  0  0  31/03/  DE under   0  Detailed estimate under preparation.  EST
               3.52.002    2023    arranging of Booms & Improvements to Road                    2024  prep.
                                   Surface at LC Gates Under ADEN/KRNT Section.