Page 369 - GM's Annual Inspection Booklet DEC- 2022
P. 369

SN PH PROJECT  PH Y-o-S PB   Short Name of Work            Alloc.  Last Sanc  Exp. upto  Exp.   Exp.   Anti.   Est.   %age  REMARKS    Status
             SN ID             Item                                       Cost  March   during   upto   TDC of   Status  Phy.
                               (PB,LB,                                                                     prog
                               DRM)                                             '22   2022-  date  Rly     of Rly
                                                                                      2023      portion
          60 38 11.03.30.19. 30 2019- LB-  HYB Divmn :- Bolarum-Cavalry Barracks - Road over  RRSK  0  0  0  0  31/03/  DE under   0  Alternate alignment is under consideration.   WIP
               1.52.006    2020 182 bridge in lieu of manned level crossing No.250              2024  prep.   Alignment-1&2: A lot of land acquisition is involved.
                                                                                                              Alignment- 3: RUB can be proposed near to existing
                                                                                                              natural drainage available. Sufficient embankment
                                                                                                              height and a direct road approach are available.
                                                                                                              Feasibility is under study. Span configuration to be
                                                                                                              decided. If RUB is not feasible, GHMC is requested to
                                                                                                              send a letter to Railways for dropping the work.

          61 39 11.03.30.19. 30 2019- LB-  HYB Div :- UPW-KMC- Road over bridge in lieu of   RRSK  0  0  0  0  31/03/  DE under   0  Joint Inspection to be done. Alignment is in process   WIP
                                                                                                     prep.
               1.52.007    2020 186 manned level crossing No.209/A                              2024          of finalization.
          62 40 11.03.30.19. 30 2019- LB-  HYB Divn :Proposed Elimination of Manned LCs by  S.Fund, 404144 17421  42881 60302 31/08/  Det. Est.   10 DHNE: Box launched  107, 209 & 215A, Tender   WIP
                                                                                                     Sanc.
               1.52.008    2020 179 RUBs(10Nos) SC-DHNE 07 LCs viz.   RRSK                      2024          Awarded for 31, 100 & 150. TDC 31/08/2024.
                                   31,66,100,107,137,147 & 150. SC-MUE 03 LCs viz.                            MUE Sec: Tender to be Called for 137, 147, 66 & 249.
                                   209, 215A & 249.
          63 41 11.03.30.19. 30 2019- -  Hyderabad division - SC-DHNE Section :-Elimination  RRSK  23652  9286  8  9294  31/03/  Det. Est.   70 Box casting  Completed, Box Launching done. TDC   WIP
                                                                                                      a
                                                                                                       n
                                                                                                     S
                                                                                                     Sanc.
                                                                                                        .
                                                                                                       c
                                                          -
                                                          3
                                                            0

                                                           0

                                                         0
                                                       2
                                                       /
                                                      0
                                                        0
                                                    2
                                                     1
                                                                                                                 3
                                                                                                                  /
                                                                                                                   2
                                                                                                               1
                                                                                                                /
                                                                                                                 0
                                                                                                                    0
                                                                                                2
                                                              y
                                                             b
                                                                                                                    2
                                                                                                  2
                                                                                                 0
                                   f

                           0
                            2
                                      n
                                       n
                                    M
                                      a
                .
                 5
               4.52.001 1  2 2020 0  o of Manned LC No. 116 KM 210/200-300 by                   2023 3        3 31/03/2023 3
               4
                   0
                   0
                 2
                  .

                                               1
                                              .
                                            N
                                             o
                                                  K
                                                  M

                                                1
                                                6
                                          L
                                           C

                                        e
                                         d

                                   Providing RUB in between IKI-MOA Station.
          64 42 11.03.30.19. 30 2019- -  Hyderabad division - SC-DHNE Section :-Elimination  RRSK  24270  2605  0  2605  31/03/  Det. Est.   60 Work Completed. TDC 31/03/2023   PHC
               4.52.002    2020    of Manned LC No. 110 @ KM 205/800-900 by                     2023  Sanc.
                                   Providing RUB in between PDO-IKI Station.
          65 43 11.03.30.19. 30 2019- -  Hyderabad Division - Proposed Ancillary Work for   RRSK  20236  114  4  118  31/03/  Det. Est.   60 Box casting  Completed, Box Launching done. TDC   WIP
                                                                                                     Sanc.
               4.52.003    2020    RUBs in lieu of LC NO. 116                                   2023          31/03/2023

          66 44 11.03.30.19. 30 2019- -  Hyderabad division - SC-DHNE Section :-Elimination  RRSK  23207  7  12918 12925 30/09/  Det. Est.   0  Boxes casted. Launching to be done. TDC   WIP
                                                                                                     Sanc.
               4.52.004    2020    of Manned LC No. 158 @ KM 284/100-200 by                     2023          30/09/2023
                                   Providing RUB in between VDI-BVO Station.