Page 38 - CRS E-Booklet Dec-2022
P. 38
5. Bridges in HYB Division (ABSTRACT)
Sr.No ADEN Railway Bridges (Para 2.11, 2.12 & 2.15 of Sub-Structure & Foundation Code) Not Applicable Grand
Total
Waterway RUB LHS ROR Total ROB FOB Tot
Box Slab Pipe Arch RCC/ Steel Composite Mixed Other
PSC Girder Girder
Girder
1 ADEN/KRNT 59 402 85 3 14 6 0 18 0 45 2 0 634 14 6 20 654
2 ADEN/KCG 4 132 3 18 1 6 0 14 0 17 0 0 195 15 19 34 229
3 ADEN/MED 14 95 21 34 1 1 0 23 0 1 0 0 190 8 14 22 212
4 ADEN/NZB 14 179 36 24 7 0 0 43 0 25 0 0 328 5 6 11 339
Grand Total 91 808 145 79 23 13 0 98 0 88 2 0 1347 42 45 87 1434
Bridges: Category Wise
Water way RUB/ Grand
S.No ADEN ROB FOB
Minor Major Important LHS Total
1 ADEN/KRNT 561 23 3 47 14 6 654
2 ADEN/KCG 169 9 0 17 15 19 229
3 ADEN/MED 185 4 0 1 8 14 212
4 ADEN/NZB 284 18 1 25 5 6 339
Grand Total 1199 54 4 90 42 45 1434
36