          JEDDAH SOUTH CONTAINER TERMINAL WORKS

          STAGE 4B




          PROJECT DETAILS                                                                                                          PROJECT OVERVIEW:
          Location: Jeddah, Kingdom of Saudi Arabia                                                                                EDECS undertook extensive infrastructure work on a total area of 83,120 square meters for the Jeddah South

          Name of Client: DP World                                                                                                 Container Terminal in KSA. The project included comprehensive earthwork, the construction of paving layers, precise
          Role in Contract: Main Contractor                                                                                        road marking, and the installation of electrical, sewage, and slot drain networks. Additionally, firefighting networks
                                                                                                                                   and reefer gantries were incorporated into the design.
          SCOPE OF WORK                                                                                                            This project is set to significantly enhance the terminal's operational capacity, boosting the port’s container handling
                                                                                                                                   from 2.4 million to a minimum of 3.8 million TEUs by 2024. Key components of the scope involved the supply and
                                         Consultant Name: AECOM
          INFRASTRUCTURE                 Contract Duration: 6 Months                                                               installation of pipes, manholes, valves, cables, and high masts,  ensuring the  terminal's infrastructure meets the
                                         Project Type: Infrastructure Works                                                        highest standards of efficiency and safety.