          PROJECT DETAILS                                                                                                          PROJECT OVERVIEW:
          Location: Cairo, Egypt                                                                                                   As the main contractor, EDECS led the infrastructure construction of the Joseph Tito Bridge Near Cairo International

          Name of Client: Egyptian Government                                                                                      Airport project in Egypt to establish a crucial link between 6  of October Street and Taha Hussein Corridor, New Nozha,
                                                                                                                                                                                     th
          Role in Contract: Main Contractor                                                                                        and Suez Bridge, optimizing traffic flow and alleviating congestion on Abdel Hamid Badawi Street, especially for
                                                                                                                                   commuters traveling towards Al Orouba Corridor or Ismailia Desert Road. Spanning a 1500-meter-long, 12-meter-
          SCOPE OF WORK                                                                                                            wide bridge, it features 4 lanes.

                                         Consultant Name: ACE Moharram Bakhoum
             BRIDGES
                                         Contract Duration: 4 Months
                                         Project Type: Bridges