Page 2 - PROGRAM PERFORMANCE PROFILE
P. 2
AREA IX - LABORATORIES
PROGRAM PERFORMANCE PROFILE
PARAMETER A – LABORATORIES, SHOPS/FACILITIES
1. SYSTEM-INPUTS AND PROCESSES
➢ Present the approved building plan showing the location of laboratory rooms/shops
utilized in the program and its conformity to RA 6541 – National Building Code of the
Philippines & PD 856 – Code of Sanitations of the Philippines.
The New Science building floor plan showing 10 natural science laboratory rooms utilized by the
students enrolled in science laboratory subjects.