Page 3 - BPA Area VII PARAMETER E
P. 3

Area VII - Library


                 Parameter E – Physical Set-up



                 and Facilities








                  SYSTEMS – INPUTS AND




                  PROCESSES




                   Location and sites


                   S.1. The library is strategically located

                   accessible to students, faculty and other

                   clientele.





                   S.2. The library is systematically planned to

                   allow future expansion.





                   Space Requirement

                   S.3. The size of the library meets standard

                   requirements                 considering              the       present

                   enrollment and future expansion.
   1   2   3   4   5   6   7   8