Page 278 - GM booklet 2019 test
P. 278
SIGNAL AND TELECOM
I. General
HYB division has MACLS with LED Signals. All the stations are provided with Integrated
Power Supply (IPS) and Dataloggers Networked to Divisional and Zonal HQrs. On
Telecom side the division has 100% 6 Quad underground cables for communication.
OFC provided in the entire division except MJF BP – MLY GC section.
II. Key information of S&T department
Type of Signaling
MACLS with Panel and EI : 57 (PI-50 & EI-7)
a. Standard II ® : 56
b. Standard I ® : 01 (BDHN)
Type of block working
Absolute Block Sections : 50
a. Single line Token less Block Sections : 47
b. Single line UFSBI with BPAC : 03
Automatic Block Sections : 07
L.C. Gates
a. Total Manned Gates : 163
b. Total Interlocked gates : 83
c. Mid-Section Interlocked gates : 39
d. Station Section Interlocked Gates : 44
e. Gate Holding Arrangement : 11
f. Dead Approach Locking (60sec) : 28
g. Sliding Type Boom at Interlocked gates : 59 (Tfc -40 & Engg-19)
h. Electrically Operated Lifting Barriers : 17 (Tfc-10 & Engg-7)
i. Approach Warning System : 31
Power Supply Arrangement
a. Full IPS : 64
b. Mini IPS : 26
c. Solar Panels at Stations : 09
d. Solar Panels at LC gates : 35
Data Loggers
a. Stations/Cabin : 58 (Incl. MJF-BP)
b. LC gates/ Auto Sections/Huts : 73 (RTUs)
c.
245