Page 2 - EMU_Car_Shed(MLY)
P. 2
Provision of New modified locking arrangement on TM covers.
In view of Novel Corona virus (COVID-19), Energisation of all EMU& MEMU rakes
stabled at shed and outstations is being done every 2 days and ensured the batteries
condition, proper stabling and other parameters, Movement of these rakes stabled at
shed and outstations is being done every 7 days as per the guidelines given by
railway board to avoid hardening of the Gear case compound.
As per the guidelines given by Head Qtrs, 04 Rakes of 4- Car MEMU formations
comprising of 2 MC + 2 TC and 02 Rakes of 8- Car MEMU formations comprising of 2
MC + 6 TC were formed and out of these, 04 Rakes are being utilized by traffic
department to run workmen specials between HYB-KZJ, KZJ-BZA, KZJ-BPQ, SC-
SUH as per their requirement w.e.f 21.05.2020.
In view of Novel Corona virus (COVID-19), in the month of April, 02 Wash basins at
canteen, and 01 tap at inspection shed has been modified to foot operated type.
Foot operated wash basins
82