Page 1 - PH-3100
P. 1
Exp. Exp. %age
PROJECT PB Item Last upto during Anticipate Phy.
SN PH Y-o-S (PB,LB,D Short Name of Work Alloc. Sanc d TDC of REMARKS Status
ID RM) Cost March 2020- Rly portion progres
'20 2021 s of Rly
11.03.31.18. 31 2018- - SC-DHNE section :Through Ballasting of track RRSK 15111 0 1600 31/03/2022 90 BCM completed. Ballast collection Work in Progress. TDC WIP
1 4.52.009 2019 for a length of 7.125 KMs 31/03/2022
11.03.31.18. 31 2018- - Secunderabad-Dhone Section: TBR-10.50 km RRSK 23354 1489 6021 31/03/2022 90 BCM work completed. Ballast collection Work in Progress. TDC WIP
2 4.52.010 2019 31/03/2022
11.03.31.18. 31 2018- - Mudkhed-Secunderabad Section: TTRR(CS)-5 RRSK 6372 633 3519 31/12/2021 25 Work in progress. TDC 31/12/2021 WIP
3 4.52.011 2019 sets (MED-1in12-4 Sets & BMO-1in16-1 Set)
11.03.31.18. 31 2018- - Secunderabad-Dhone Section: CTR(P)-1.40 km RRSK 24570 896 5154 30/04/2021 90 CTR Work Completed. FCC Under Process (Material Booking for PHC
4 4.52.012 2019 (km.24.00-25.40) Rails to be done) TDC - 30.04.2021
11.03.31.18. 31 2018- - Secunderabad-Dhone Section:TBR-6.10 km RRSK 13940 0 1600 31/03/2022 90 BCM work completed. Ballast collection Work is in Progress. TDC WIP
5 4.52.014 2019 31/03/2022
11.03.31.18. 31 2018- - HYB Division: procurement of track fitings (Pway RRSK 23331 6045 23 31/12/2021 40 Work in Progress (This Work is for supply of P.Way Materials). WIP
4.52.015 2019 Materials) and other components (ERcs, Metal TDC 31/12/2021
6
Liners, GRSP, Single Coil Spring washers etc., )
11.03.31.18. 31 2018- - SC-DHNE Section: CTR(P) for a length of 1.40 RRSK 24570 0 10113 30/04/2021 90 CTR Work Completed. FCC Under Process (Material Booking for PHC
7 4.52.016 2019 Km From Km 47.50 to Km 48.90 between TMX Rails to be done) TDC - 30.04.2021
and SHNR stations
11.03.31.18. 31 2018- - SC-DHNE Section: CTR(P) for a length of 0.8 RRSK 15641 0 4351 31/12/2021 80 CTR Work Completed TDC 31/12/2021 WIP
8 4.52.017 2019 Km From Km 51.70 to Km 52.50 between TMX
and SHNR stations..
11.03.31.19. 31 2019- - Hyderabad Division: Supplying of welding RRSK 10073 0 0 31/03/2022 0 Work in Progress. TDC 31/03/2022 WIP
9 4.52.001 2020 portions with accessories
11.03.31.19. 31 2019- - HYB Division: Procurement of Pway Fittings RRSK 24454 0 0 31/12/2021 0 Indent Submitted for Procurement. TDC 31/12/2021 WIP
10 4.52.002 2020 (Improved SEJs, GRSP for steel channel
sleepers, Over riding switches etc)
11.03.31.19. 31 2019- - HYB DIvision: Procurement of track fitings (Pway RRSK 24622 0 0 31/12/2021 0 Indent Submitted TP section for Procurement. TDC 31/12/2021. WIP
11 4.52.003 2020 Materials) and other components (ERcs, Liners,
GRSP, CMS Xings etc.,)
11.00.31.13. 31 2013- PB-468 Mudkhed-Secunderabad - TFR - 39 km, TWR - DRF,RR 178871 69925 26949 31/03/2023 40 TFTR work in Progress (5 Kms completed and 26 Kms is WIP
12 1.52.029 2014 16.6 km & TFTR - 31 km SK balance). TFR & TWR Work Completed. TDC 31/03/2023
11.00.31.13. 31 2013- PB-469 Secunderabad-Dhone - TWR - 39.49 km DRF,RR 85453 79491 0 31/03/2021 95 Work in Progress. 2.5 Kms Work is balance, Mobile Flash Butt PHC
13 1.52.030 2014 SK Weld Plant awaited. TDC - 31/03/2021
11.03.31.15. 31 2015- PB-311 Janakampet-Bodhan - CTR(S) -17.795 km DRF,RR 213688 187641 879 31/07/2021 90 Work nearing completion. Welding of Rail joints in progress for PHC
14 1.52.001 2016 SK conversion into LWR. Financial Liabilities and Ballast Booking also
in Progress. TDC 31/07/2021.
11.03.31.16. 31 2016- PB-407 Mudkhed-Secunderabad - TBR-107 km DRF,RR 216681 72201 28093 31/12/2021 50 Work in progress. Ballast collection work is in progress. TDC WIP
15 1.52.002 2017 SK 31/12/2021
11.03.31.16. 31 2016- LB-369 Secunderabad-Dhone - CTR(P)-1.10 km RRSK 17499 9811 497 31/03/2021 90 CTR(P) Work Completed, FCC Under Process. (Material Booking PHC
16 2.52.001 2017 to be done.)TDC - 31/03/2021.
11.03.31.17. 31 2017- PB-454 Secunderabad-Dhone - TTR-15 sets & SEJ - 49 RRSK 55815 31940 8615 31/12/2021 75 Work in Progress. TDC 31/12/2021 WIP
17
1.52.001 2018 set