Page 10 - ps SIGNAL AND TELECOM
P. 10
ASSISTANCE REQUIRED
Proposal for creation of posts pending at PCPO/SC:
a. MMTS Phase-I (BMO-MED& FM-UR) - Signal-21 posts (sent to
PCPO/SC on 04.01.2019).& Telecom-12 posts (sent to PCPO/SC on
05.09.2019).
b. New Line between AKE-MDK - Signal-4 posts & Telecom-4 posts (sent
to PCPO/SC on 05.09.2019).
Coach Midlife Rehabilitation Workshop at KRNT - Telecom-4 posts (sent
to PCPO/SC on 22.02.2017).
Request for filling up of two JE/Drg posts vacant from 2014.
Office space/buildings required for Signal and Telecom supervisors at
KMC, UR and GWD.
Pickup trucks required for signal and telecom supervisors at DAB, KMC
and UR.
Page 10 of 10