Page 10 - ps SIGNAL AND TELECOM
P. 10

ASSISTANCE REQUIRED


                            Proposal for creation of posts pending at PCPO/SC:
                              a.  MMTS  Phase-I  (BMO-MED&  FM-UR)  -  Signal-21  posts  (sent  to
                                 PCPO/SC on 04.01.2019).& Telecom-12 posts (sent to PCPO/SC on
                                 05.09.2019).
                              b.  New Line between AKE-MDK - Signal-4 posts & Telecom-4 posts (sent
                                 to PCPO/SC on 05.09.2019).
                            Coach Midlife Rehabilitation Workshop at KRNT - Telecom-4 posts (sent
                              to PCPO/SC on 22.02.2017).
                            Request for filling up of two JE/Drg posts vacant from 2014.

                            Office space/buildings required for Signal and Telecom supervisors at
                              KMC, UR and  GWD.
                            Pickup trucks required for signal and telecom supervisors at DAB, KMC
                              and UR.

















































                                                                                               Page 10 of  10
   5   6   7   8   9   10