9. Checking of Turnouts and Crossovers With 2030 mm pantograph:
As per the Headquarters Special drive No. 51 Dated: 05.11.2020, All the Turnouts and
Crossovers should be checked with 2030 mm pantograph free movement in view of recent
panto entanglements in other Divisions. Division has done Turnout and Crossover checking
by fixing the 2030 mm panto on tower cars. In HYB sub-division, all the stations and major
yards were checked with 2030 mm panto and defects were attended.
II. Special Works carried out in HYB division:
a) RVNL Railway Electrification works Staff were deputed at FM – SHNR, GWD – RC &
UR – MBNR sections for Erection of masts and DA‟s at FM –UR, GWD-RC sections and
for SED checking.
b) Bifurcation of Power supply in Automatic territory 5 Nos. of 5 KVA A.Ts charged with
25KV OHE at RKO [ 1 no.], BOZ [2 nos.] & YKA-HPG [2 Nos] for non-blanking of Signals
to facilitate 230 V AC supply to S&T Goomties.
c) OHE modification work completed in view of “New Satellite Depot” at CVB/Yard.
OHE modification works at CVB yard
d) Mock drill : was conducted by NDRF/GNT at BMO and OHE wires of RD-4, 5 slewed and
Re-slewed at BMO/Yard on 13.02.2021
Mock Drill at BMO