Page 2 - A H - ECS MLY
P. 2
In view of Novel Corona virus (COVID-19), Energisation of all EMU& MEMU rakes
stabled at shed and outstations is being done every 2 days and ensured the batteries
condition, proper stabling and other parameters, Movement of these rakes stabled at
shed and outstations is being done every 7 days as per the guidelines given by
railway board to avoid hardening of the Gear case compound.
As per the guidelines given by Head Qtrs, 04 Rakes of 4- Car MEMU formations
comprising of 2 MC + 2 TC and 02 Rakes of 8- Car MEMU formations comprising of 2
MC + 6 TC were formed and out of these, 04 Rakes are being utilized by traffic
department to run workmen specials between HYB-KZJ, KZJ-BZA, KZJ-BPQ, SC-
SUH as per their requirement w.e.f 21.05.2020.
In view of Novel Corona virus (COVID-19), in the month of April, 02 Wash basins at
canteen, and 01 tap at inspection shed has been modified to foot operated type.
Foot operated wash basins
In view of Novel Corona virus (COVID-19), Disinfectant is being sprayed regularly
to all the rooms and in the shed premises of inspection shed & POH repair shed
84