IMPROVEMENTS CARRIED OUT FOR

                                    REDUCTION OF FAILURES




                Replaced 18 Kms  of Defective  Signalling  Cables identified  during  annual
                 cable  meggering.

                Replaced  956  nos.    of  various    capacities    of    secondary    cells  which
                 completed  their codal life.

                Replaced 67 Nos. of worn out point machines along with ground connection
                 and insulations.

                Replaced 176 nos. of worn out panel knobs.

                Annual  Cable  meggering  completed  at  91  locations  as  per  schedule.  No
                 locations are overdue.

                System Integrity test carried out at 10 stations as per schedule.  No stations
                 are overdue.

                Replaced 281 nos. of aspects with Integrated LEDs at 10 stations.

                Provided 292 Chokes in Relay ends at 07 stations & 05 Auto sections.