Page 3 - CRS Mech Power C&W
P. 3
MECHANICAL
(CARRIAGE AND WAGONS)
1. Location of ARMEs:
Sl Important
No Location Composition Depot Equipments
03 Coaches: (SPARME) Hydraulic Rescue
1. Medical Van. Device, Electrical
2. Auxiliary Van forMech. & SSE/ Cold cutting
Eletc. Equipments Equipments, Plasma
1 NZB C&W/
3. Staff Rest Van & Kitchen NZB Cutting Equipment,
Fit for 110 KM/Hr. Hydraulic Re-railing
Equipment,
Inflatable lights,
2. Location of ARTs
Sl Locati Important
No on Composition Depot Equipments
03 Coaches and 2 Wagons: Hydraulic
1. Mech. Tool van Re-railing
2. Kitchen & Staff rest Van. Equipment, Gas
3. Electrical (Generator, cutting
1 NZB Engineering and Telecom SSE/ C&W/ equipment,
NZB
equipment van). Inflatable lights,
Wagons: wheel floating
1. Engg. Materials. equipment,
2. Engg. Rails. Towing
2 KCG Mobile ART CDO/KCG Equipment.
3. Periodical Inspection Reports:
Joint Inspection of the ART/ARMEs is being conducted by JA Grade Officers regularly. No
deficiency/defect was noticed with important equipments like HRD Equipments, Cutting
Machines etc. Any Short comings noticed during the periodical inspections, are brought to
the notice of Concerned Officers for remedial action.
4. ART/ARMV Trails:
Trial Run/Mock-Drills of MRVs and ARTs in the division are being conducted periodically and
the lapses noticed are being informed to Concerned Officers for necessary action. No major
lapses are noticed during these Mock-drills/Trial Runs. The deviations like delay in turning
up of the ARMEs due to Indirect-dispatch and other minor irregularities are being analyzed
and necessary remedial action is being taken.
18