Page 3 - CRS Mech Power C&W
P. 3

MECHANICAL

                                             (CARRIAGE AND WAGONS)


            1.  Location of ARMEs:

                    Sl                                                                   Important
                    No    Location            Composition                Depot          Equipments
                                       03 Coaches: (SPARME)                        Hydraulic Rescue
                                       1. Medical Van.                             Device, Electrical
                                       2. Auxiliary Van forMech. &       SSE/      Cold cutting
                                       Eletc. Equipments                           Equipments, Plasma
                     1       NZB                                         C&W/
                                       3. Staff Rest Van & Kitchen        NZB      Cutting Equipment,
                                       Fit for 110 KM/Hr.                          Hydraulic Re-railing
                                                                                   Equipment,
                                                                                   Inflatable lights,

            2.  Location of ARTs

                     Sl    Locati                                                         Important
                     No      on              Composition                  Depot          Equipments
                                     03 Coaches and 2 Wagons:                         Hydraulic
                                     1. Mech. Tool van                                Re-railing
                                     2. Kitchen & Staff rest Van.                     Equipment, Gas
                                     3. Electrical (Generator,                        cutting
                      1     NZB      Engineering and Telecom           SSE/ C&W/      equipment,
                                                                           NZB
                                     equipment van).                                  Inflatable lights,
                                      Wagons:                                         wheel floating
                                     1. Engg. Materials.                              equipment,
                                     2. Engg. Rails.                                  Towing
                      2     KCG      Mobile ART                         CDO/KCG       Equipment.

            3.  Periodical Inspection Reports:

               Joint Inspection of the ART/ARMEs is being conducted by JA Grade Officers regularly.  No
               deficiency/defect  was  noticed  with  important  equipments  like  HRD  Equipments,  Cutting
               Machines etc.  Any Short comings noticed during the periodical inspections, are brought to
               the notice of Concerned Officers for remedial action.

            4.  ART/ARMV Trails:

               Trial Run/Mock-Drills of MRVs and ARTs in the division are being conducted periodically and
               the lapses noticed are being informed to Concerned Officers for necessary action.  No major
               lapses are noticed during these Mock-drills/Trial Runs.  The deviations like delay in turning
               up of the ARMEs due to Indirect-dispatch and other minor irregularities are being analyzed
               and necessary remedial action is being taken.