Page 1 - FKB
P. 1
STATION: FKB-H KMS: 438.5 CLASS : HG-3
I. STAFF STRENGTH II.(a).BUILDING-RESIDENTIAL
Department Staff Strength Type I II III IV Total
Total Actual Vac Available - - - - -
Total - - -
III. WATER SUPPLY ARRANGEMENTS II.(b).BUILDING- SERVICE
Total Demand (Lts) 1000 Station Building 1
i. Domestic (Lts) - PWI office -
ii. Service Building (Lts) 1000
IV.PASSENGER AMENITIES
2 nd Class 18
1.Waiting Hall (in Sqm) 6. Taps 1
1 st Class -
PF. No. 1 30
2.Platform Shelter(in Sqm) 7.Lavatories/Urinals 2/1
PF. No. 2 -
PF. No. 1 340
3.Platform Length (in Meters) 8. Water Coolers -
PF. No. 2 -
4. Seats No's 26 9. Foot Over Bridge -
5. Vending Stall No's - 10. ShaddyTrees 8
V.PASSENGER DETAILS
i. Number of Passengers dealt per day (Nos.) 0
ii. Average Earnings of the station per day (Rs. In Lakhs) 0
2020-21 2021-22
VI. EARNINGS OF THE STATION 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
1. Passengers 288235 0 0 0
2. Parcels 0 0 0 0
3. Goods 0 0 0 0
VII. LOADING/UNLOADING
2020-21 2021-22
A.Loading -Outward 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity 0 0 0 0
2020-21 2021-22
B. Unloading - Inward 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity 0 0 0 0