Page 13 - Cleco FTB Overview
P. 13
Power Trade Entry
Description
Trade information is listed in the table below for the following trade types: Power Physical, Power ZRC, and Power Swap.
Trades entered during this session will be used for credit, scheduling and settlements.
Materials
Power Physical Trade Entry Job Aid
Power ZRC Trade Entry Job Aid
Power Swap Trade Entry Job Aid
Type Direction Product Control Point Market Area Time Period Quantity Block Price
Area
Power Buy Power MISO-S LA HUB MISO LA HUB 2020-07 50 5x8 $27/mwh
Physical mwh/HOUR
Power ZRC Sell ZRC MISO-S LRZ.9 MISO LRZ 9 2020-06 8 mw/MONTH $.40/ kwm
Power Swap Swap Type Power MISO-S LAGN 2021-01 Variable:
MISO LAGN.LAGN DA
= BUY
Fixed: $25/mwh

