Page 13 - Cleco FTB Overview
P. 13

Power Trade Entry

    Description

    Trade information is listed in the table below for the following trade types: Power Physical, Power ZRC, and Power Swap.

    Trades entered during this session will be used for credit, scheduling and settlements.



    Materials

    Power Physical Trade Entry Job Aid

    Power ZRC Trade Entry Job Aid
    Power Swap Trade Entry Job Aid








      Type               Direction         Product Control  Point                       Market Area            Time Period           Quantity              Block        Price

                                                          Area

      Power              Buy               Power          MISO-S          LA HUB        MISO LA HUB            2020-07               50                    5x8          $27/mwh
      Physical                                                                                                                       mwh/HOUR


      Power ZRC          Sell              ZRC            MISO-S          LRZ.9         MISO LRZ 9             2020-06               8 mw/MONTH                         $.40/ kwm


      Power Swap Swap Type  Power                         MISO-S          LAGN                                 2021-01                                                  Variable:
                                                                                                                                                                        MISO LAGN.LAGN DA
                         = BUY
                                                                                                                                                                        Fixed: $25/mwh
   8   9   10   11   12   13   14   15   16   17   18