Page 14 - RASSoW08Q - Roll-on Roll-off (RO-RO) Lorry Operations
P. 14

Mid UK Recycling       Driver Risk Assessment & Safe System of Work

            Section 1           Risk Index   Section 2               Section 3                           Section 4              Risk Index

     Description of the hazards   Without   What/ Who    Arrangements required to adequately   Person responsible for implementing   With Control
            and risks            Control     is at risk            control the risk              and monitoring the controls     Measures


                               S x P =  RI                                                                                      S x P =  RI

        Speed Ramp on Site                              Located in the entrance to the
        (Quarrington Yard)                 Drivers      transport yard is a speed ramp. TO
                                                        SLOW TRAFFIC DOWN. This ramp is
                                           Other Road   to be driven over at a speed between
                                           Users
                               2  3   L                 3 to 5 Mph and then the vehicle                                        2   2    L
                                           Pedestrians
                                           Cyclist      speed can be increased to the yard
                                           VRU’s        speed limit of 10 Mph. please keep
                                                        to 10 MPH in the yard.



                                           Drivers

            RESERVED                       Other Road
                                           Users
                                           Pedestrians
                                           Cyclist
                                           VRU’s






                                                                                                                                                                                       HSF18

                                                                                                                                                                               RASSoW08Q
                                                                                                                                                                           RO-RO Lorry Operations




                                                                                                                                                                                   Review Dates:
                                                                                                                                                             (V5) – 06-09-2023 / Next R/D 05-09-2024
                                                                                                                                                           Review by FORS Practitioner - Steve Bennett
                                                                                                                                                         Approved by General Manager – Fred Flatters
   9   10   11   12   13   14   15   16   17   18   19