Page 5 - Mountain Transport - Low Loader
P. 5

Driver Risk Assessment & Safe System of Work

    Preparation Prior to Loading:



           Section 1           Risk Index    Section 2                Section 3                        Section 4             Risk Index

     Description of the hazards   Without Control  What/   Arrangements required to adequately    Person responsible for    With Control
            and risks                        Who is at             control the risk            implementing and monitoring    Measures
                                               risk                                                   the controls
                              S x P =   RI                                                                                  S x P =   RI


     When climbing onto and                            When climbing up and down from the trailer  Group Head of Fleet, General
    off the trailer, use 3 points             Drivers  drivers are to use the rear ramps when they   Manager, and Transport &
           of contact         5    2   10   Employees  are in their downward position. DO NOT   Compliance Managers to ensure
                                                       stand on the rear ramp bar of the trailer. If   the rules are all applied whilst
                                                                                              drivers operate on their site.  2  5     L
                                                       the ramps are in the up position, then use
                                                       the small ladder provided to access the
                                                       trailer.





                                              Drivers  Drivers are to ensure that they talk directly   Group Head of Fleet, General
    Appropriate signals to and
                                            Employees  to the plant operator prior to loading any   Manager, and Transport &
      from plant operators.                                                                   Compliance Managers to ensure
                              5    2   10              machinery onto the low loader trailer.
                                                       Discuss the hand signals to be used whilst   the rules are all applied whilst
                                                       loading / unloading plant machinery. Most   drivers operate on their site.  2  5  L
                                                       importantly discuss the STOP signal.

                                                                                                                                                                              RASSoW 18Q

                                                                                                                                                                    Low Loader Trailer

                                                                                                                                                                              and Vehicle




                                                                                                                                                                                   Review Dates:
                                                                                                                                                             (V2) – 06-01-2025 / Next R/D 05-01-2026
                                                                                                                                                                          Review by Steve Bennett
                                                                                                                                                            Approved by General Manager – Rick Legg
   1   2   3   4   5   6   7   8   9   10