Page 112 - BPA Area 8-Parameter B
P. 112

Area VIII–Parameter B


                     Buildings








                      IMPLEMENTATION






                      I.9.  Periodic drill on disaster and risk


                      reduction (earthquake, flood, fire, etc.) is

                      conducted.
   107   108   109   110   111   112   113   114   115   116   117