Page 19 - RISE General Overview Booklet 4.19.22
P. 19
IRON & OAK
BIRMINGHAM, AL
UNITS 259
UNIT MIX 1BR/1BA, 2BR/2BA
SIZE 304,177 SF
CONSTRUCTION START September 2021
COMPLETION DATE July 2023
TOTAL COST $52.6 M
ARCHITECT Dwell Design Studio
GC RISE
PROJECT MANAGERS Ryan Bourque, Brian Sudduth
PROJECT DESCRIPTION
• The most exciting feature about this community is its location on Red
Mountain which will offer residents striking views of the surrounding landscape
and city. A natural and rustic, yet modern, aesthetic will add to the community’s
charm and seamless integration into the existing landscape and community.
• Iron & Oak is located on 1110 Beacon Parkway East and offers one bedroom/
one bathroom and two bedroom/two bathroom floor plans. Residents will enjoy
a high-end amenity set designed for comfort, convenience, and lifestyle.
• The unit-mix features 138 one-bedroom floor plans and 121 two-bedroom floor
plans, each with balcony or patio options.
• Featured amenities will include: a pool, fitness center, outdoor recreation area,
clubhouse, outdoor lounge area, grilling stations, private office spaces, a club
kitchenette, connection to the Vulcan Trail, and more.