ON-LINE MONITORING THE EFFICIENT WAY

          The How?

        Step 1:
        Connect the PDTrac II to your plant network using a standard ethernet cable.

        Step 2:
        Configure the PDTrac II to receive the asset operating conditions:  kV, MW, MVar and Temperature.

        Step 3:
        Configure your DCS to receive the PDTrac II output via ModBus/TCPIP protocols.

        Step 4:
        Configure your DCS to alert when the appropriate conditions are met, such as:
            •  PD is above the 75% and increasing at the rate of 100% over a 12-month interval
            •  PD is above the 90% and increasing at a rate of 50% over a 12-month interval
            •  Negative PD is greater than the Positive PD for a multi-turn coil winding
            •  Positive PD is greater than the Negative PD and directly correlates with load

        Step 5:
        Use the PDTracPro across your plant LAN software to analyze the data that led to the alert

        Step 6:
        Perform additional testing and/or visual inspections based on the results of Step 5