Page 2 - Safety Memo
P. 2

Poison Control – 1-800-222-1222   Dig Alert – 811  Local OSHA Office –   Local Police Department –   Local Fire Department –








            Project Contact Information      Subcontractors and Jobsite Visitors  Anyone entering the project site for the first time must report to the ACI field Office and  receive jobsite safety orientation training.  Tradesmen will receive a standard jobsite  orientation, while visitors will receive shorter training covering the primary health and  safety issues.  Visitors must sign in/out and be escorted while on ACI jobsite.  Personal Protective Equipment  All tradesmen and vis











              Project Manager – xxx-xxx-xxxx   Superintendent –   Safety Professional –    Clinic –  Emergency – Dial 911    approved hard hats,  hard   hard  hard  hard  hard  har  r  har  h  d  d  d approved  proved  prove  ove  e  appro  pp  pp  p  garments.   garments.    ments  nts  n  en  n  With any incident o  o  o  With any  With any  any  With an  n  an  an  h  h  h  With  With  With  c dents/injurie  r e • All l accide  c d  c  c  e A mmediately to the  te immediate  mmedi








        ACI Safety Orientation









                                            on trained in First/Aid CPR  when necessary.   e tagged   tagged  e tagge  tagge  agge  tag  ta  e  e shall l be  e  be   be  sha  sha  sh adders sh  sh  sh  ers  rs  ers  r  er  ad  ladders used to  used to  d  d on ladders ion ladders  ladder  ladder  ladde  add  sion  sion  on  io  io  o  point.    oint  o nt  o nt  o n  n  oin  oin  g. Trench/Excavati ion shall l  /Excavation  av  a ench/Exc  h/E  ench/E  /E  /E  /  / ng. Tren i ing. Tr
                                             ga  g  g  g  •W  ged  agged  ged  • A  • A  A  • A  to access   s  s  s  access  s  access  ce  e  acce  ce  c  o a  a  to  to  to  m  i  •  •  •  shall  shall  shall  all  a  a  sh  avat on  avat on  n  n  ava  •A  •A  than  deeper than  an  an  a  a  ha  a  a  per  er  pe  e  pe  or  or  or  o  onsit  on  o  e type.  type  ype  type  type  type  ype  ype  pe  pe  p  m   form   m   perform  m r perform or perform  m  form  fo  fo  fo  f



           Project Name:                                  Job #                                   Date:






                                    have signage, protective barriers, cables or approved guardrails


                                                               5  shall be protected from cave in by approved methods.

                     Project Rules & Procedures  Slips, Trips and Falls – This project has same level and elevated fall hazards throughout the site.  To minimize your risk of injury from a slip, trip, or fall, use appropriate footwear, do not run, be  aware of your surroundings, and changes in terrain, do not wear dark tint safety glasses in low lit  Fall protection – 100% fall protection is required when tradesmen are exposed to a fall hazard of  6  or greater.  Openings and Holes m






                                                                        work on any electrical equipment.   tag or lockout device.   person . Inspections shall be performed and documented daily.   Smoking – Areas will be assigned and signs will be posted.    property and jobsites.











                           areas.                                                            Mechanic .    do not use .
   1   2   3   4   5   6   7