Page 39 - KL TMA - Triple Runway Operations_Neat
P. 39
Arrival Scheme for Triple RWY Ops-
RWY14/15
KL TMA ARRIVAL: LEVEL/SPEED ALLOCATION SCENARIO
RWY14/15
RWY14L RWY14R RWY15
(PMS East) (PMS North) (PMS West) WMSA
NOT
PUGER
ALLOWED 1 FL 220 / PLV
NOT 270kts*
NIREN
ALLOWED 1 FL 220 / PLV FL 220 / PLV
NOT 270kts* NOT 270kts*
KAKAK
ALLOWED 1 ALLOWED 1
PULIP
NOT
SAROX
FL 220 / PLV ALLOWED 1 FL 220 / PLV
270kts* NOT 270kts* FL 220 / PLV
GUPTA
ALLOWED 1 270kts* 1 For triple Runway Operation.
NOT * For common jet aircraft.
SALAX
ALLOWED 1 PLV – Planned Level
enavasiapacific.com 39