PELEDAKAN DI TAMBANG BAWAH TANAH



                  (UNDERGROUND MINE BLASTING)






                  9. TOP AND HEADING BLASTING FOR TUNNELING













                                       4 m




                                                                                                                                                    15 m




                                                                                       2.7 m
                                       4 m









                                                                3.0 m                                                     10 m








                    PUSAT PENGEMBANGAN SUMBER DAYA MANUSIA GEOLOGI, MINERAL DAN BATUBARA