Page 22 - Interbay 2nd Charge Consent - Email and Docs
P. 22
Existing Tree Removed (Red Dotted Line) Bedroom 2 Kitchen 11.5m² 8.7m² 2500 Plan 7 Sheffield Stands Front (14 Bike Spaces) Hall Door Store 6000 Living/Dining 22.8m² Communal Main Lobby 2200 Entrance 2100 Living/Dining East Elevation North Elevation West Elevation 22.8m² Store Hall Front Door Bedroom 2 Kitchen 11.5m² 8.7
New Boundary Treatment Close Boarded Fence 1.8M East Elevation
New Tree New Tree
Bike Store (14 Spaces)
Disabled Bay
New Tree
Recycling 3 x 1100 Litre
Parking Courtyard (23 Spaces) 6000
Dropped Kerb Refuse 3 x 1100 Litre Bin store with separated recycling and refuse areas North Elevation South Elevation
Refuse 3 x 1100 Litre Sliding Doors
4100
Dropped Kerb Dropped Kerb
Disabled Bay Bin Store 3 x 240 Pedestrian Gate Automatic Folding Gate (clear of bin stores & pedestrian gate) Recycling 3 x 1100 Litre
6000
New Tree
Plan
Existing Trees Removed (Red Dotted Line) West Elevation
New Tree New Tree
Existing Crossover
New Boundary Treatment Dwarf Brick Wall 0.9M Railings Above 0.9M Existing Kerb (Red Dotted Line) Extended Front Recycle Enclosure Specification: 3 x 1100 Litre bins grouped separately for refuse. 3 x 1100 Litre bins grouped separately for recycling. 1.8M Brick wall & railings to sides, with close boarded fence to rear - Finish and col