What makes

       FRAMING green?

PRO TIP:                              Skip the           Use a two-foot modular construction.
                                      headers;           A building design based on two-
Advanced Framing:                     they are not       foot increments makes sizing more
The method of framing shown           needed in          predictable and framing easier to
here is called optimum value          non-bearing        install. It also minimizes the amount
engineering, or OVE. It saves         walls.             of waste produced when cutting
lumber and allows for better                             framing materials.
insulating of the home–
a win-win for the homeowner                                                                              Line up roof
and the environment.                                                                                     framing with
                                                                                                         wall and floor
  BASF HP+ Wall System                                                                                   framing.

   Available in multiple assemblies,                                                                                     Increase stud spacing
   the HP+ Wall System incorporates                                                                                      from 16” to 24” and
   WALLTITE spray foam, ENERSHIELD,                                                                                      replace framing members
   a fluid-applied air- and water-                                                                                       with insulation. Wider
   resistive barrier, and Neopor                                                                                         spacing provides more
   graphite-enhanced rigid foam                                                                                          room for insulation and
   insulation to achieve a superior                                                                                      can reduce onsite waste.
   envelope while using less lumber.                                                                                     Note: Some jurisdictions in
   http://bit.ly/1iiW8a8                                                                                                 hurricane-or earthquake-
                                                                                                                         prone areas may not allow
                                                                                                                         24” framing.

                                      Align window                                                Use single top plates
                                      with stud                                                   with in-line framing, to
                                      spacing.                                                    transfer loads directly.

                                      Use a single                                                Size each insulated
                                      stud at rough                                               header for its particular
                                      opening,                                                    load and span.
                                      if local
                                      wind codes
                                      and span
                                      requirements
                                      allow.

                                      Eliminate cripple
                                      studs under
                                      window opening.

                                      Use two-stud                               Use header
                                      corner framing                             hangers instead
                                      with inexpesive                            of jack studs.
                                      drywall clips.
                                                         Construct a
                                                         “slab-on-grade” to                       IMAGE: BUILDING SCIENCE CORPORATION
                                                         eliminate first floor                    AND YOUTHBUILDUSA.ORG
                                                         framing and sheathing.