                          OVERVIEW OF PRODUCTIVITY IMPROVEMENT OVER TIME

                          Productivity (value added per worker), real, $2005
                                                                                                  Manufacturing
                            $ thousand per worker                                                 Construction

                           105
                           100
                            95
                            90
                            85
                            80                                                                                     1.7X
                            75
                            70
                            65
                            60
                            55
                              1994     1996     1998     2000    2002     2004     2006     2008     2010     2012



                   day, for the purposes of this demonstration. I laid the clear detail
                   against the built example, so they could see each line of the detail
                   over the actual elements…and the light bulbs in their heads went on.
                     A collaborative approach to the AEC is what needs to be presented
                   in every AEC course, globally. We need to teach what buildings are
                   and about to all of the players in the AEC. Each of us doesn’t need
                   to know everything about what everyone does and how to do it,
                   but we certainly need to be aware that they all exist. We can create
                   collaborative team members with mutual respect for everyone’s role in
                   contributing to one of the oldest, most important industries on Earth.
                     I attended online conferences recently in which construction
                   companies referred to “the construction industry”, and didn’t use
                   the words “architects” or “architecture”, but referred instead to “pre-
                   construction services.” An engineering conference I attended online
                   referred to “design engineering” instead of architecture. As architects,
                   we can do a better job of integrating ourselves into the building
                   industry, and can bene t from that when we do.
                     Today’s AEC industry can seem somewhat disjointed and
                   discontinuous. We need to increase our ability to successfully,
                   efficiently and effectively communicate building information
                   across the AEC for the bene t of the entire industry. Beginning in
                   our schools. This can actually unite us in a common goal. We need
                   industry members aware of the bene ts of increasing collaboration
                   across the industry. There is need for, and room for, improving.
                     During this current pause of AEC work due to the pandemic
                   shutdown, I encourage AEC professionals to consider how we all
                   can be more collaborative in successfully working across the AEC
                   and improving the industry for its own bene t, and for our clients.  GB

                   Terry Beaubois is CEO of BKS: Building Knowledge Systems, LLC
                   (www.bksco.com/tbagbm). He may be contacted at          Teamwork does it. Increased collaboration will improve the industry’s
                   tbeaubois@gmail.com                                     overall efficiency and effectiveness.

                   54  GREEN BUILDER November/December 2020                                               www.greenbuildermedia.com




          52-54 GB 1120 In the Field.indd   54                                                                                 12/10/20   7:03 PM
   51   52   53   54   55   56   57   58   59   60   61