Page 56 - Area 8 PPP
P. 56
- The newly constructed Administration building of three floors is quite enough for the
different administrative offices to house. In fact, the Third floor were pre-designed
as a library but then construction of a new library building is on-going, giving the new
admin building to have an extra space for other purposes.
- All offices conform the standard size based on the National Building Code.
PARAMETER E - ASSEMBLY, ATHLETIC and SPORTS FACILITIES
1. SYSTEM- INPUTS AND PROCESSES
Present in pictorial form function rooms for holding meetings, conferences,
convocations and other gatherings.
- Pictures shown below are the function rooms for holding meetings,
conferences, convocations and other gatherings.