Page 16 - Harbour Sludge Stabilisation.pdf
P. 16
Information presented in figures 4 and 5 must be considered in light of the fact that the first 2 load cycles on
test piece 3 (purple point) did not contribute to the failure of the test piece. Because of the very large spread
of the test results the regression analysis for the determination of a fatigue line has not been performed.
14