Page 16 - Harbour Sludge Stabilisation.pdf
P. 16

Information presented in figures 4 and 5 must be considered in light of the fact that the first 2 load cycles  on
               test piece 3 (purple point)  did not contribute to the failure  of the test piece. Because of the very large spread
               of  the test results the regression analysis for the determination of a fatigue line has not been performed.



















































































                                                                                                        14
   11   12   13   14   15   16   17   18   19   20   21