Page 35 - RoadCem Soil Stabilisation.pdf
        P. 35
     RoadCem – Reversibility and Reinstatement
                                   RoadCem soil stabilisation can be reinstated using the following steps:-
                                         Deep re-mixing of the stabilised layer to achieve the desired soil granularity
                                         The addition of water and pH adjustment as necessary
                                         Replacement of stripped topsoil materials
                                         Tillage of topsoil into a tilth
                                         No additional surface layers to be disposed of
                                         RoadCem: The most sustainable soil stabilisation system available in the UK





