Tan Cang –
Tan Cang – Tan Cang –
Item Dong Van
Hai Phong ICD Que Vo ICD
Ha Nam ICD
Close to NH1A &
Location Dinh Vu IZ Chau Phong IZ Phap Van-Cau Gie-
Ninh Binh highway
Total Area 30 ha 27 ha 10 ha
Annual Capacity 800,000 TEU 400,000 TEU 150,000 TEU
Quay Length n/a 360 m (03 berths) n/a
To be built
Warehouse To be built 6,000 m2 CFS
3 fixed cranes, 2
Facility n/a reachstackers, 2 RTGs, 72 n/a
reefer plugs, 20 trucks
Close to river Able to receive 160TEU
Advantage
terminals barge
Ready to Operate Already 3Q2020 Already
October 21