Page 5 - UNIT ASSET MANAGEMENT
P. 5

SENARAI KOLAM AIR AGIHAN  DAERAH MELAKA TENGAH
                                                           KAPASITI
             NO                NAMA                                                        JENIS                TWL  BWL  TAHUN      HAKMILIK     G1
                                                   GELEN   (M3)     LITER
                1 TANGKI SEDUTAN BUKIT PERINGGIT      6,000    27      27,240 R.C.C.R REINFORCED CONCRETE CIRCULAR RESERVOIR  36.59  34.59  1996 SYARIKAT AIR MELAKA BERHAD  ADA
                2 TANGKI MENARA BUKIT PERINGGIT       24,000  109     108,960 P.S.T.E PRESS STEEL TANK ELEVATED  51.59  48.59  1982 SYARIKAT AIR MELAKA BERHAD  ADA
                3 TANGKI AIR SEDUTAN TAMAN SAUJANA INDAH   10,000  45  45,400 H.D.P.E HIGH DENSITY POLYETHELNE                 SYARIKAT AIR MELAKA BERHAD  ADA
                4 TANGKI MENARA TYT                  120,000  545     544,800 P.S.T.E PRESS STEEL TANK ELEVATED  69.24  66.24  1996 PERBADANAN ASET AIR BERHAD  ADA
                5 TANGKI SEDUTAN TYT                  13,200   60      59,928 G.F.S.G GLASS FUSED TO STEEL GROUND  24.7  23  2016 SYARIKAT AIR MELAKA BERHAD  ADA
                6 TANGKI MENARA TAMAN HANG TUAH       72,000  327     326,880 P.S.T.E PRESS STEEL TANK ELEVATED  64.09  61.96  1985 PERBADANAN ASET AIR BERHAD  ADA
                7 TANGKI SEDUTAN TAMAN HANG TUAH 2    61,600  280     279,664 P.S.T.G PRESS STEEL TANK GROUND    20.27  16.27  2012 SYARIKAT AIR MELAKA BERHAD  ADA
                8 TANGKI SEDUTAN  TAMAN HANG TUAH 1   17,600   80      79,904 P.S.T.G PRESS STEEL TANK GROUND    19.27  16.27  1985 PERBADANAN ASET AIR BERHAD  ADA
                9 TANGKI MENARA TAMAN PERUNA          18,000   82      81,720 F.R.P.E FIBREGLASS REINFORCED PLASTIC ELEVATED  36.61  32.96  2013 SYARIKAT AIR MELAKA BERHAD  ADA
                10 TANGKI SEDUTAN TAMAN PERUNA 1      19,200   87      87,168 G.F.S.G GLASS FUSED TO STEEL GROUND  15.65  11.85  2009 SYARIKAT AIR MELAKA BERHAD  ADA
                11 TANGKI SEDUTAN TAMAN PERUNA 2      59,400  270     269,676 G.F.S.G GLASS FUSED TO STEEL GROUND  15.65  11.85  2011 SYARIKAT AIR MELAKA BERHAD  ADA
                12 TANGKI AIR SEDUTAN BUKIT DARAT -  (6 POLYTANK X 8000)  48,000  218  217,920 H.D.P.E HIGH DENSITY POLYETHELNE  0  0  2021 SYARIKAT AIR MELAKA BERHAD  ADA
                13 TANGKI MENARA TAMAN TANAH MERAH JAYA  100,000  455  454,000 G.F.S.E GLASS FUSED TO STEEL ELEVATED  60.48  56.28  1993 SYARIKAT AIR MELAKA BERHAD  ADA
                14 TANGKI SEDUTAN TAMAN TANAH MERAH JAYA  35,000  159  158,900 G.F.S.G GLASS FUSED TO STEEL GROUND  15  12.5  1993 PERBADANAN ASET AIR BERHAD  ADA
                15 TANGKI MENARA TAMAN TANJUNG MINYAK UTAMA (SERVICE)  138,000  627  626,520 E.R.C.R.R ELEVATED REINFORCED CONCRETE RECTANGULAR RESERVOIR  33.09  29.59  2005 PERBADANAN ASET AIR BERHAD  ADA
                16 TANGKI SEDUTAN TAMAN TANJUNG MINYAK UTAMA  60,000  273  272,400 R.C.R.R REINFORCED CONCRETE RECTANGULAR RESERVOIR  22.33  18.33  2005 PERBADANAN ASET AIR BERHAD  ADA
                17 TANGKI MENARA TAMAN KRUBONG JAYA   60,000  273     272,400 G.F.S.E GLASS FUSED TO STEEL ELEVATED  40  34  2019 SYARIKAT AIR MELAKA BERHAD  ADA
                18 TANGKI AIR MENARA TAMAN BUKIT RAMBAI PUTRA   132,174  601  600,070 F.R.P.E FIBREGLASS REINFORCED PLASTIC ELEVATED  37.8  33.5  2021 SYARIKAT AIR MELAKA BERHAD  ADA
                19 TANGKI SEDUTAN TAMAN BUKIT RAMBAI PUTRA   66,400  302  301,456 F.R.P.G FIBREGLASS REINFORCED PLASTOC GROUND  17.09  14.1  2021 SYARIKAT AIR MELAKA BERHAD  ADA
                20 TANGKI MENARA TAMAN SERI BERTAM   351,000  1,595  1,593,540 G.F.S.E GLASS FUSED TO STEEL ELEVATED  69.13  63.5  2013 SYARIKAT AIR MELAKA BERHAD  ADA
                21 TANGKI SEDUTAN TAMAN SERI BERTAM   80,000  364     363,200 F.R.P.G FIBREGLASS REINFORCED PLASTOC GROUND  44.09  41.96  2013 SYARIKAT AIR MELAKA BERHAD  ADA
                22 TANGKI MENARA TAMAN BUKIT LARANG INDAH  100,000  455  454,000 R.C.R.R REINFORCED CONCRETE RECTANGULAR RESERVOIR  33.2  30.4  1990 PERBADANAN ASET AIR BERHAD  ADA
                23 TANGKI SEDUTAN TAMAN BUKIT LARANG INDAH  83,000  377  376,820 F.R.P.G FIBREGLASS REINFORCED PLASTOC GROUND  28.7  25.7  2006 PERBADANAN ASET AIR BERHAD  ADA
                24 TANGKI SEDUTAN TAMAN BUKIT LARANG INDAH  50,000  227  227,000 R.C.R.R REINFORCED CONCRETE RECTANGULAR RESERVOIR  28  24.5  1977 PERBADANAN ASET AIR BERHAD  ADA
                25 TANGKI MENARA TAMAN BUKIT KATIL DAMAI  83,600  380  379,544 G.F.S.E GLASS FUSED TO STEEL ELEVATED  23.15  17.7  2016 SYARIKAT AIR MELAKA BERHAD  ADA
                26 TANGKI SEDUTAN TAMAN BUKIT KATIL DAMAI  155,320  706  705,153 G.F.S.G GLASS FUSED TO STEEL GROUND  9  3.5  2016 SYARIKAT AIR MELAKA BERHAD  ADA
                27 TANGKI INDUSTRI BUKIT RAMBAI 1     89,000  405     404,060 P.S.T.G PRESS STEEL TANK GROUND    51.52  48.72  1988 PERBADANAN ASET AIR BERHAD  ADA
                28 TANGKI SEDUTAN INDUSTRI BUKIT RAMBAI  1,000,000  4,545  4,540,000 R.C.C.R REINFORCED CONCRETE CIRCULAR RESERVOIR  34.75  29.16  1986 PERBADANAN ASET AIR BERHAD  ADA
                29 TANGKI INDUSTRI BUKIT RAMBAI 2     85,000  386     385,900 F.R.P.G FIBREGLASS REINFORCED PLASTOC GROUND  53.54  50.54  2012 SYARIKAT AIR MELAKA BERHAD  ADA
                30 TANGKI TAMAN BUKIT CHENG          250,000  1,136  1,135,000 R.C.C.R REINFORCED CONCRETE CIRCULAR RESERVOIR  57.1  51.6  1997 PERBADANAN ASET AIR BERHAD  ADA
                31 TANGKI SEDUTAN TAMAN BUKIT CHENG  100,000  455     454,000 R.C.C.R REINFORCED CONCRETE CIRCULAR RESERVOIR  20.72  15.92  1997 PERBADANAN ASET AIR BERHAD  ADA
                32 TANGKI MENARA BUKIT BARU          100,000  455     454,000 G.F.S.E GLASS FUSED TO STEEL ELEVATED  24.09  21.09  2009 SYARIKAT AIR MELAKA BERHAD  ADA
                33 TANGKI MENARA TAMAN CHENG JAYA    100,000  455     454,000 P.S.T.E PRESS STEEL TANK ELEVATED  31.83  28.19  1995 PERBADANAN ASET AIR BERHAD  ADA
                34 TANGKI MENARA TAMAN SUTERA WANGI  101,200  460     459,448 G.F.S.E GLASS FUSED TO STEEL ELEVATED  42.28  37.72  2015 SYARIKAT AIR MELAKA BERHAD  ADA
                35 TANGKI SEDUTAN TAMAN SUTERA WANGI  484,000  2,200  2,197,360 G.F.S.G GLASS FUSED TO STEEL GROUND  36.3  33.15  2015 SYARIKAT AIR MELAKA BERHAD  ADA
                36 TANGKI MENARA TAMAN TAMBAK PAYA HARMONI   220,000  1,000  998,800 G.F.S.E GLASS FUSED TO STEEL ELEVATED  33.8  29.8  2020 SYARIKAT AIR MELAKA BERHAD  ADA
                37 TANGKI SEDUTAN TAMAN TAMBAK PAYA HARMONI   110,000  500  499,400 F.R.P.G FIBREGLASS REINFORCED PLASTOC GROUND  18.3  14.3  2020 SYARIKAT AIR MELAKA BERHAD  ADA
                38 TANGKI AYER KEROH GOLF            150,000  682     681,000 R.C.C.R REINFORCED CONCRETE CIRCULAR RESERVOIR  61.28  57.28  1975 PERBADANAN ASET AIR BERHAD  ADA
                39 TANGKI SOLOK JENUANG              150,000  682     681,000 R.C.C.R REINFORCED CONCRETE CIRCULAR RESERVOIR  37.5  32.5  1972 PERBADANAN ASET AIR BERHAD  ADA
                40 TANGKI MENARA TAMAN PERTAM JAYA   160,000  727     726,400 G.F.S.E GLASS FUSED TO STEEL ELEVATED  21.63  16.15  2004 SYARIKAT AIR MELAKA BERHAD  ADA
                41 TANGKI MENARA TAMAN PAYA RUMPUT INDAH  320,000  1,455  1,452,800 E.R.C.R.R ELEVATED REINFORCED CONCRETE RECTANGULAR RESERVOIR  46.85  43  2000 SYARIKAT AIR MELAKA BERHAD  ADA
                42 TANGKI SEDUTAN TAMAN PAYA RUMPUT INDAH  160,000  727  726,400 R.C.R.R REINFORCED CONCRETE RECTANGULAR RESERVOIR  37  35  2000 SYARIKAT AIR MELAKA BERHAD  ADA
                43 TANGKI MENARA BANDAR BARU SUNGAI UDANG  166,000  755  753,640 G.F.S.E GLASS FUSED TO STEEL ELEVATED  44  40.715  2009 SYARIKAT AIR MELAKA BERHAD  ADA
                44 TANGKI MENARA LIMBONGAN PERMAI    200,000  909     908,000 G.F.S.E GLASS FUSED TO STEEL ELEVATED  14.6  8.93  2004 SYARIKAT AIR MELAKA BERHAD  ADA
                45 TANGKI MENARA TAMAN KRUBONG PERDANA (SERVICE)  455,000  2,068  2,065,700 G.F.S.E GLASS FUSED TO STEEL ELEVATED  41.6  37  2012 SYARIKAT AIR MELAKA BERHAD  ADA
                46 TANGKI SEDUTAN TAMAN KRUBONG PERDANA  220,000  1,000  998,800 G.F.S.G GLASS FUSED TO STEEL GROUND  22.1  18.1  2012 SYARIKAT AIR MELAKA BERHAD  TIADA
                47 TANGKI BUKIT BAKUL (LAMA)         250,000  1,136  1,135,000 G.F.S.G GLASS FUSED TO STEEL GROUND  39.63  33.63  1973 PERBADANAN ASET AIR BERHAD  ADA
                48 TANGKI MENARA BUKIT BAKUL (BARU)  500,000  2,273  2,270,000 G.F.S.E GLASS FUSED TO STEEL ELEVATED  57.84  52.84  1996 PERBADANAN ASET AIR BERHAD  ADA
                49 TANGKI AIR SEDUTAN TAMAN PAYA EMAS ( 2 POLYTANK X 8000)  16,000  73  72,640 H.D.P.E HIGH DENSITY POLYETHELNE  0  0  2018 SYARIKAT AIR MELAKA BERHAD  ADA
                50 TANGKI MENARA TAMAN DESA BERTAM   533,000  2,423  2,419,820 E.R.C.C.R ELEVATED REINFORCED CONCRETE CIRCULAR RESERVOIR  65.1  60  2019 SYARIKAT AIR MELAKA BERHAD  ADA
                51 TANGKI SEDUTAN TAMAN DESA BERTAM  270,000  1,227  1,225,800 F.R.P.G FIBREGLASS REINFORCED PLASTOC GROUND  44.85  40  2019 SYARIKAT AIR MELAKA BERHAD  ADA
                52 TANGKI AIR MENARA TAMAN OZANA RESIDEN   558,000  2,536  2,533,320 E.R.C.C.R ELEVATED REINFORCED CONCRETE CIRCULAR RESERVOIR  64.48  59.5  2020 SYARIKAT AIR MELAKA BERHAD  ADA
   1   2   3   4   5   6   7   8   9   10