How Much?
Location, location, location - costs! Lon- Your Gertrud log home will come fully
don is the second most expensive place to prepped with routing for all sockets and
build new, in the world! switches, saving time on site.
These are high end build costs for a 4 bed Per socket you could expect to pay £60-75
home of a similar size to Agnes, possibly depending on the location. Work in our log
not quality and do not forget a contingen- homes is much quicker than in convention-
cy sum of at least 10% for conventional al homes, saving time and money.
build.
Build Costs Electricians
150.0 M 2 - £450,000 FUSE BOXES, SOCKETS,
FIRST FIX SWITCHES, SHOWERS,
LIGHTING
Location dependent, average hourly rates
£25.00. Remember - logs outside, logs inside!
You might need a carpenter for fitting Normally we have no need for plastering
doors and floors but not for our homes as in our log homes - saving you a considera-
they all come fully prepped for installa- ble sum of money and mess!
tion by our own installation team.
Carpentry Plastering
FLOORING, INTERNAL DOORS, WALLS AND CEILINGS
STAIRCASES
WORTH NOTING
Factory Manufacture
Means your costs are fixed once we put your building
into production - contingency sums for your home are
not needed.