Page 9 - C:\Users\peiro.m\Desktop\ppp\
P. 9

Supervision of the construction of a 2,400-meter breakwater
                                 and dredging operations with a volume of 680,000 cubic meters
   4   5   6   7   8   9   10   11   12   13   14