Page 5 - ptp
P. 5

Design and supervision of the construction of 1,300 meters of rubble mound road, 500 meters of pile and deck
                  access road, 2,000 meters of pipe rack structure, and pipelines for the transfer of petroleum products.
   1   2   3   4   5   6   7   8   9   10