Page 17 - 001 BKL Data
P. 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Notes
N N
CONCRETE 1 : 2 : 3
PENANGKAL PETIR
M M
Ø 12mm
Ø8-150
PIPA KABEL BC
L L
CONCRETE 1 : 3 : 5 70 1
UK 1 "
2
440 300 Rev. Description
70 BC 50 MM2
K - - K
(TO CONTROL BOX)
CONCRETE 1 : 3 : 5 - -
70 300 70 - -
440 COPPER ROD 1/2" - -
J J
T = 3.0 M - -
- -
POTONGAN A-A PENANGKAL PETIR - -
300 Project
I I
BC 50 MM2
(TO CONTROL BOX) PLTS ROOFTOP 25 KWP
CONCRETE 1 : 2 : 3
H EKSOTERMIK WELDING H
(CADWELD CONNECTION) - -
Ø 12mm Client
Ø8-150
G G
PIPA KABEL BC COPPER ROD 1/2"
CONCRETE 1 : 3 : 5 70 1
UK 1 " T = 3.0 M
2
440 300 Name Date Sign
F - - F
70 BC 50 MM2 Checked
(TO CONTROL BOX) 3000 Approved - -
CONCRETE 1 : 3 : 5 Contractor
E 70 300 70 E
440 COPPER ROD 1/2" BUMIKHARISMA
T = 3.0 M
PT. BUMIKHARISMA LININUSA
POTONGAN A-A PEMBUMIAN Name Date Sign
D D
Checked - -
Approved - -
Drawn Created Edited
C 70 Deden - C
300 Title
70 Struktur Bak Kontrol
B Grounding B
LAYOUT BAK KONTROL COPPER ROD Drawing No.
01
Scale Page Size
A A
NTS 1 OF 1 A4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21