Page 4 - Panduan Simulasi Homer KKP PLTS Hybrid
P. 4
Input File Name & Description
1. Change Name as the
name of the locations
2. Input description
summary about the
simulations
4. Choose file,
and save as
according to 3. The annual
the name of capacity shortage
the locations value of hybrid
system we assumed
0% as the generator
will operate to meet
the capacity. If 100%
RE and no generator
the capacity shortage
is 5%