Page 37 - MODUL ELEKTRONIK ESTIMASI BIAYA KONSTRUKSI
P. 37

Tabel 2. 8 Pemasangan1 m3 batu kosong (aras lamping)
                                                                                  Harga Satuan      Jumlah
                  No            Uraian            Kode      Satuan    Koefisien
                                                                                      (Rp)        Harga (Rp)
                   A  TENAGA
                       Pekerja                   L.01.01     OH          0,7800
                       Tukang Batu               L.02.04     OH          0,3900
                       Kepala Tukang             L.03.01     OH          0,0090
                       Mandor                    L.04.01     OH          0.0090
                                                   JUMLAH TENAGA KERJA
                   B  Bahan
                                                                3
                       Batu belah                             m          1.2000
                       Semen Portland                         Kg       136.0000
                                                                3
                       Pasir pasang                           m          0.5440
                                                    JUMLAH HARGA BAHAN
                   C  Peralatan
                                                      JUMLAH HARGA ALAT
                   D  Jumlah (A+B+C)
                   E  Overhead & Profit 15%                                15%
                   F  Harga Satuan Pekerjaan (D+E)



                                                    DAFTAR HARGA

                  Tabel 2. 9 Daftar Harga Upah Tenaga Kerja
                           No                Nama Upah                  Satuan          Harga
                            1    Pekerja/Buruh Tidak Terlatih             OH               62,200.00
                            2    Tukang                                   OH               79,500.00
                            3    Tukang Alumunium                         OH               79,500.00
                            4    Tukang Ledeng                            OH               79,500.00
                            5    Tukang Batu                              OH               79,500.00
                            6    Tukang Kayu                              OH               79,500.00
                            7    Tukang Besi                              OH               79,500.00
                            8    Tukang Besi Konstruksi                   OH               79,500.00
                            9    Tukang Besi Profil                       OH               79,500.00
                           10    Tukang Cat                               OH               79,500.00
                           11    Tukang Las                               OH               79,500.00
                           12    Tukang Listrik                           OH               79,500.00
                           13    Kepala Tukang                            OH               87,200.00
                           14    Juru Ukur/Surveyor                       OH               71,000.00
                           15    Mandor                                   OH               83,300.00
                           16    Operator Mesin Berat                     OH               88,000.00
                           17    Pengawas Las                             OH               58,000.00
                           18    Pembantu Sopir                           OH               62,200.00
                           19    Sopir                                    OH               79,500.00








                  MODUL ESTIMASI BIAYA KONSTRUKSI SMK KELAS XI                                        27
   32   33   34   35   36   37   38   39   40   41   42