Component
Sidewalk asphalt patch repairs Sidewalk failed brick repairs Crosswalk asphalt patch repairs Crosswalk failed brick repairs Granite pavers
Granite curb resetting
Granite Belgian blocks resetting
at tree wells
Street tree tree replacements Street tree tree lighting repairs Traffic signals - repaint yellow poles and signal housing to black (or replace)
Traffic signals signals - repaint yellow signals signals on galv arms
Sign poles - straightening repairs Street light poles - refinishing
Parking meters bike racks bollards - straightening Temporary sign removal
7 Hills Park - Walkway repairs 7 Hills Par - Barren Earth repair 7 Hills Park - Tree replacement 7 Hills Park - Tree pruning
7 Hills Park - Aerial Sculpture repairs Subtotal (rounded)
Cost Estimating Contingency Add
Total Order of Magnitude Cost (rounded)
Quan 1860
1150
600
940
120
200
12 10
35
14
8 38
32
40
12 1000
4000
6 25
7 Unit
sf
sf
sf
sf
lf
lf
ea well ea tree ea tree ea unit ea signal ea loc ea pole ea meter ea sign sf
sf
ea tree ea tree ea sculpture
50% Unit
Price
Cost 65 100 40
250 21 000
32
900
7 200
8 000
4 800
20 000
52 500 70 000
16 000
3 800
6 400 4 000
- 35
000
40
000
12 000
12 500 35
000
490 000
250 000
740 000
Scope
remove asphalt patches prepare base install new brick to match existing
replace broken/pulverized brick level areas that have subsided
remove asphalt patches prepare base install new brick to match existing
replace broken/pulverized brick level areas that have subsided
remove asphalt patches prepare base install new granite pavers
to match existing
remove curb curb adjust base reset curbs with tight joints
remove blocks adjust base reset existing
blocks in neat pattern
remove asphalt plugs and former tree roots plant substantial new trees
install new conduit and sensors restring trees
with LED light strings
replace existing
yellow light poles and signal fixtures with black LED units
replace existing
yellow signal fixtures with new black LED units
remove obsolete/unneeded signs straighten poles to plumb/vertical
refinish - repaint black straighten poles to plumb/vertical
remove old stickers
removal
by owners
remove section
of brick regrade base reset bricks level with adjacent sections
prepare grade to support new lawn remove existing
tree tree roots plant new trees
thin/remove overburdened branches
replace porcelain enamel interpretive signs repair steel columns replace sculptures
1 2 3 4 5 6 7 8 9 10
11 12 13 14
15 16 17 18 19 20 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 35
35
35
35
60
40
400 2 000
1 500 5 000
2 000
100 200
100 - 35
10
2 000
500 5 000
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 53