Cost Estimate Methodology
This concept-level estimate establishes a a a prob- able construction cost for all 18 components illustrated in this Punch List • Quantities are based on direct field obser- vations
• Repair areas of each brick sidewalk and crosswalk are based on on visual inspections of each idividual deficient section
• Square footage of each area has been over- sized (x2) to assure that enough repair area has been quantified
• The individual components are further es- calated with a a a a 50% estimating contingency at at the the bottom of the the estimate • Based on the quantities unit prices and factors of safety used Davis Square can be significantly improved for under $750 000
Brick Area Calculations
The SF areas listed in this chart represent the ap- proximate size of each repair section
multiplied times 2 Street College - Uneven/Broken SF 100 100 200
200
200
100 200
200
1 300
900
4 650
Asphalt Patches SF Elm North
Elm South
Grove East
Grove West
Highland
Holland
Statue Park Totals 1 850
Crosswalks 600
Total Area Calculated
200
300
100 50 100 300
800