Page 23 - DavisNow Community Meeting 2.13.2019
P. 23

 Report Card
DavisNow.org Community Meeting 2.13.2019 23
DAVIS SQUARE PUNCH LIST
DATE 2/13/19
NO COMPONENT DEPT
CONTACT
Haleema Qureshi
Haleema Qureshi
Vanessa Boukili
Steve MacEachern
Steve MacEachern
Steve MacEachern
Steve MacEachern
Steve MacEachern
Steve MacEachern
Steve MacEachern Haleema Qureshi
Steve MacEachern
Vanessa Boukili
Vanessa Boukili
George Proakis
SCOPE
Replace brick with new system – materials TBD; should be durable and fit with character of square (stamped asphalt a last resort, consider other options) HSH
Repair areas where units are broken and/or out of level – HSH developing scope of work for this
Holland and Elm complete; Dover still has missing trees
Replace existing yellow poles and signal fixtures with black LED units
Replace existing yellow signal fixtures with new black LED units
Remove obsolete/unneeded signs; straighten poles to plumb/vertical
Refinish and repaint black
Straighten poles to plumb/vertical; remove old stickers
Straighten, replace broken racks
Straighten to plumb/vertical
Raise and reset bricks at east end to prevent ponding, and at Meacham St crossing to make accessible; repair brick as needed along walkway boarders. HRSeHpadirevgeralospsin–gcescnotepreaonfdweodrgkefsorupthtios brick walkways
Remove existing tree stumps; plant new trees to match original design
Thin/remove overburdened branches
replace porcelain enamel interpretive signs, repair steel columns, replace scul ptures
SCH START
MMYY
SCH END
MMYY
STATUS
NOT STARTED INPROGRESS INCOMPLETE COMPLETE
     1 Brick sidewalks ENG Haleema Qureshi Remove asphalt patches; repair missing, displaced and broken bricks; restore 2/19 brick sidewalks to extent feasible* – HSH developing scope of work for this
   2 Brick crosswalks
4 Granite borders and paving
6 Street tree replacement
8 Traffic signals
9 Traffic signals on galv. poles
10 Sign poles
11 Street light poles
12 Parking meters
13 Bike racks
14 Bollards
16 7 Hills Park brick walks
17 7 Hills Park barren earth
18 7 Hills Park tree replacement
19 7 Hills Park tree pruning
20 7 Hills Park aerial sculpture
ENG
ENG
OSPCD
DPW
DPW
DPW
DPW
DPW
DPW
DPW ENG
DPW
OSPCD
OSPCD
OSPCD
9/18
 3 Granite street curbs ENG Haleema Qureshi dRevseltoapsinngesecdoepdetofmweoertksfiodretwhiaslks and avoid tripping hazards – HSH developing scope of work for this
   5 Granite tree curbs and Belgian blocks ENG Haleema Qureshi Raise curbs 4- 6” and reset Belgian blocks neatly around openings – HSH developing scope of work for this
   7 Street tree lighting repairs DPW Steve MacEachern Install new conduit and sensors; string trees with LED lights (35 trees – 12/18 partially complete)
      15 Temporary sign removal OSPCD/ George Proakis Compel owners to remove what have become permanent “temporary” and ISD real estate signs
12/18
         11/18
      REPORT CARD




















   20   21   22   23   24