Page 20 - SFS Brochure 2022
P. 20

Kent (on-going)

































                                      Development of 23 units across 3 Floors


                                                            Scope:
                             Design, Manufacture and Install of full load bearing frame
                                                   with HRS components


                                                           Services:
                                             •    Full Design and Engineering
                                                      •   Manufacturing

                                  •   Installation of Wall Panels and Floor Cassettes


                                                 Tonnage of Steel Used:
                                                        Estimated 70T


                                                        Time Frame:
                                                     4 Weeks per Block
   15   16   17   18   19   20   21   22