Page 20 - SFS Brochure 2022
P. 20
Kent (on-going)
Development of 23 units across 3 Floors
Scope:
Design, Manufacture and Install of full load bearing frame
with HRS components
Services:
• Full Design and Engineering
• Manufacturing
• Installation of Wall Panels and Floor Cassettes
Tonnage of Steel Used:
Estimated 70T
Time Frame:
4 Weeks per Block