1.    Readiness & Access:




             PFC will contact the principal contractor by telephone and email the day before traveling
             to an installation to check that the works are on schedule.  PFC will also check at this
             point that the elevations are complete and prepared to the standards/specification
             detailed within this document.

             Should  h           b     dy u     u         , or if there are delays caused due to
             ongoing wall preparation by the principal contractor then additional charges   y apply.


             The graphic installers must have clear access to the walls. Suitable specialist
             access equipment should be provided & in place by the principal contractor
             where previously agreed (scaffolding on stairwells for instance).


             Contractor scaffolding is preferred in staircase locations however the graphic provider can
             provide their own access equipment if required.  Should contractor scaffolding be provided
             the highest platform should be no more than 1.5m from the highest ceiling space.  The
             wall elevation should also have 0.5m of clear space for the graphic application.




             2.    Wall Preparation & Misalignment




             The use of inferior filling materials or inadequate installation of MDF panels will
             inevitably cause bowing on the wall areas from the middle.

             Inferior wall preparation fillers will react negatively with the adhesive paste used
             to install the graphics and will cause bubbling issues/visual imperfections.

             Any bowing of the wall panels during their installation will create visual & alignment
             issues for the graphics provider. Panels need to be suitably fixed to the wall structure, to
             ensure that they do not bow.

             Staircase areas are one particular elevation where there can be lots
             of issues and additional attention should be given to these locations.

             MDF biscuit joints are desirable as lifting and movement of panels is possible after the
             graphic application is complete (see example, Figure 1).  Board junctions should be
             keyed to enable the filler material to create a suitable long lasting bond across both
             vertical & horizontal joints.

             Remedial works to the graphic installation which are as a direct result of inadequate
             wall preparation will not be at the direct responsibility & cost of PFC to resolve if a
             failure occurs.