Page 3 - AMT103_EC_Commercial Sales Dominos Presentation.indd
P. 3
Product Installation
Our Collections have been designed for straight forward installation. Follow
these floor preparation and installation guidelines.
Intended Use
• Amtico products are recommended for use over
and after installation. For best results and in particular
properly prepared concrete, suspended wood, metal
when extreme temperature conditions exist, increase
and other suitable substrates.
the acclimatisation to a minimum of 48 hours.
• Do not install Amtico products until the subfloor is
prepared and the work of all other trades is complete.
to label instructions. Adhesive selection should be
appropriate to site conditions - see adhesive labels
• Amtico products can be used with radiant heating
for more detailed information. Amtico will not be held
systems, but note that the surface temperature of the
responsible for any installation complaints if a non-
subfloor must not exceed 27°C (81°F).
recommended adhesive is used.
• Amtico products are not intended for outside use.
• The floor must be rolled using a 45 kg three-section
roller in both directions.
Material Receiving, Handling & Storage
• The finished floor should be protected from point
loads and heavy traffic for 24 hours after installation
• Ensure materials delivered are the correct style,
and should not be washed for 48 hours.
colour, shade and quantity; check tiles for visual
defects.
• Report discrepancies immediately.
Routine Maintenance
• Daily sweep or dust mop the floor and clean up all
Jobsite Testing & Subfloor Preparation
spills immediately.
• Perform damp mopping or machine cleaning (<450
• The building must be sealed with stable environmental
rpm) as necessary. For routine everyday cleaning,
conditions.
use Amtico Maintainer or equivalent. For periodic
• Subfloor must be clean (free of dirt, old adhesives,
cleaning, use Amtico Stripper or equivalent and
paint, grease, wax or other contaminants that may
Amtico Dressing.
stain or prevent adhesion), smooth, flat, sound, fit for
• When machine cleaning, use a 3M red pad or
purpose and free of movement and excess moisture.
equivalent.
• Solvents must not be used to remove oils, greases,
• Do not use household washing liquids or detergents as
adhesive residues etc. as they may be absorbed into
they may leave a sticky or slippery residue on the floor
the concrete and at a later date migrate back to the
if not thoroughly rinsed.
surface, producing an adhesive failure.
• Avoid cleaners that contain abrasives or solvents that
• Test concrete for moisture content (country specific)
may permanently damage the floor.
or relative humidity in accordance with national
regulations.
• For more detailed instructions, refer to Amtico Wear &
Care at amtico.com
• Readings above the maximum permitted require
the use of a surface damp proof membrane or
adequate time for the floor to dry to an acceptable
Periodic Maintenance
standard. Record test results and corrective action(s).
Documentation is required for processing claims.
• Use stripper to remove ground in-dirt and old or worn
• Bring the subfloor to an acceptable condition using
coats of dressing.
appropriate smoothing and levelling compounds. For
• Apply dressing if desired or as necessary. Follow the
wood subfloors use approved underlayment panels.
instructions for proper usage and application.
Install surface preparation materials according to
the manufacturers’ instructions and ensure a smooth • Apply recommended Amtico adhesive according
Caution
surface to prevent any irregularities or roughness from
telegraphing through the new flooring. If the subfloor When kept clean and dry, Amtico Design Tile products
or underlayment material beneath the resilient have excellent slip-resistant properties. However, in
Product Installation flooring fails, responsibility for warranties and/or common with other smooth floor coverings, water, other
performance guarantees rests with the underlayment
manufacturer or contractor. liquids, grease and other contaminants on the surface
of the floor can make them slippery.
Product Installation
Our Collections have been designed for straight forward installation. Follow
these floor preparation and installation guidelines. For further technical information please visit amtico.
Installation Procedures
Our Collections have been designed for straight forward installation. Follow com/commercial/installation
• Inspect each tile for visual defects before installing.
these floor preparation and installation guidelines.
• Installation of flooring implies acceptance of
Intended Use materials.
• Amtico products are recommended for use over • Acclimatise Amtico products, adhesive and subfloor to
and after installation. For best results and in particular
properly prepared concrete, suspended wood, metal
Intended Use a stable condition between 18°C - 27°C (64°F - 81°F) for
when extreme temperature conditions exist, increase
and other suitable substrates. a minimum of 24 hours before, during
the acclimatisation to a minimum of 48 hours.
• Amtico products are recommended for use over and after installation. For best results and in particular
• Do not install Amtico products until the subfloor is
properly prepared concrete, suspended wood, metal • Apply recommended Amtico adhesive according
when extreme temperature conditions exist, increase
prepared and the work of all other trades is complete. to label instructions. Adhesive selection should be
and other suitable substrates.
appropriate to site conditions - see adhesive labels
• Amtico products can be used with radiant heating the acclimatisation to a minimum of 48 hours.
• Do not install Amtico products until the subfloor is • Apply recommended Amtico adhesive according
systems, but note that the surface temperature of the
for more detailed information. Amtico will not be held
prepared and the work of all other trades is complete. to label instructions. Adhesive selection should be
responsible for any installation complaints if a non-
subfloor must not exceed 27°C (81°F).
• Amtico products can be used with radiant heating appropriate to site conditions - see adhesive labels
recommended adhesive is used.
• Amtico products are not intended for outside use.
for more detailed information. Amtico will not be held
systems, but note that the surface temperature of the • The floor must be rolled using a 45 kg three-section
subfloor must not exceed 27°C (81°F). responsible for any installation complaints if a non-
roller in both directions.
Material Receiving, Handling & Storage recommended adhesive is used.
• Amtico products are not intended for outside use.
• The finished floor should be protected from point
• The floor must be rolled using a 45 kg three-section
• Ensure materials delivered are the correct style, loads and heavy traffic for 24 hours after installation
roller in both directions.
colour, shade and quantity; check tiles for visual
Material Receiving, Handling & Storage and should not be washed for 48 hours.
defects. • The finished floor should be protected from point
• Ensure materials delivered are the correct style, loads and heavy traffic for 24 hours after installation
• Report discrepancies immediately.
and should not be washed for 48 hours.
colour, shade and quantity; check tiles for visual Routine Maintenance
defects. • Daily sweep or dust mop the floor and clean up all
Jobsite Testing & Subfloor Preparation Routine Maintenance
• Report discrepancies immediately.
spills immediately.
• Perform damp mopping or machine cleaning (<450
• The building must be sealed with stable environmental • Daily sweep or dust mop the floor and clean up all
Jobsite Testing & Subfloor Preparation rpm) as necessary. For routine everyday cleaning,
conditions.
spills immediately.
• Subfloor must be clean (free of dirt, old adhesives, use Amtico Maintainer or equivalent. For periodic
• The building must be sealed with stable environmental • Perform damp mopping or machine cleaning (<450
cleaning, use Amtico Stripper or equivalent and
paint, grease, wax or other contaminants that may
Amtico Dressing.
conditions. rpm) as necessary. For routine everyday cleaning,
stain or prevent adhesion), smooth, flat, sound, fit for
use Amtico Maintainer or equivalent. For periodic
• Subfloor must be clean (free of dirt, old adhesives, • When machine cleaning, use a 3M red pad or
purpose and free of movement and excess moisture.
cleaning, use Amtico Stripper or equivalent and
paint, grease, wax or other contaminants that may
• Solvents must not be used to remove oils, greases, equivalent.
Amtico Dressing.
stain or prevent adhesion), smooth, flat, sound, fit for • Do not use household washing liquids or detergents as
adhesive residues etc. as they may be absorbed into
purpose and free of movement and excess moisture. • When machine cleaning, use a 3M red pad or
the concrete and at a later date migrate back to the they may leave a sticky or slippery residue on the floor
• Solvents must not be used to remove oils, greases, equivalent.
if not thoroughly rinsed.
surface, producing an adhesive failure.
adhesive residues etc. as they may be absorbed into
• Avoid cleaners that contain abrasives or solvents that
• Test concrete for moisture content (country specific) • Do not use household washing liquids or detergents as
the concrete and at a later date migrate back to the they may leave a sticky or slippery residue on the floor
may permanently damage the floor.
or relative humidity in accordance with national
if not thoroughly rinsed.
surface, producing an adhesive failure. • For more detailed instructions, refer to Amtico Wear &
regulations.
• Test concrete for moisture content (country specific) • Avoid cleaners that contain abrasives or solvents that
• Readings above the maximum permitted require Care at amtico.com
or relative humidity in accordance with national may permanently damage the floor.
the use of a surface damp proof membrane or
regulations. • For more detailed instructions, refer to Amtico Wear &
adequate time for the floor to dry to an acceptable
Care at amtico.com
• Readings above the maximum permitted require Periodic Maintenance
standard. Record test results and corrective action(s).
the use of a surface damp proof membrane or • Use stripper to remove ground in-dirt and old or worn
Documentation is required for processing claims.
adequate time for the floor to dry to an acceptable
coats of dressing.
• Bring the subfloor to an acceptable condition using Periodic Maintenance
standard. Record test results and corrective action(s).
appropriate smoothing and levelling compounds. For
• Apply dressing if desired or as necessary. Follow the
Documentation is required for processing claims. • Use stripper to remove ground in-dirt and old or worn
wood subfloors use approved underlayment panels.
• Bring the subfloor to an acceptable condition using instructions for proper usage and application.
coats of dressing.
Install surface preparation materials according to
appropriate smoothing and levelling compounds. For • Apply dressing if desired or as necessary. Follow the
the manufacturers’ instructions and ensure a smooth
wood subfloors use approved underlayment panels. Caution
surface to prevent any irregularities or roughness from
instructions for proper usage and application.
Install surface preparation materials according to When kept clean and dry, Amtico Design Tile products
telegraphing through the new flooring. If the subfloor
the manufacturers’ instructions and ensure a smooth Caution
or underlayment material beneath the resilient
have excellent slip-resistant properties. However, in
surface to prevent any irregularities or roughness from common with other smooth floor coverings, water, other
flooring fails, responsibility for warranties and/or
telegraphing through the new flooring. If the subfloor When kept clean and dry, Amtico Design Tile products
performance guarantees rests with the underlayment
liquids, grease and other contaminants on the surface
or underlayment material beneath the resilient have excellent slip-resistant properties. However, in
manufacturer or contractor.
of the floor can make them slippery.
flooring fails, responsibility for warranties and/or common with other smooth floor coverings, water, other
performance guarantees rests with the underlayment liquids, grease and other contaminants on the surface
Installation Procedures of the floor can make them slippery.
For further technical information please visit amtico.
manufacturer or contractor.
• Inspect each tile for visual defects before installing. com/commercial/installation
Installation Procedures For further technical information please visit amtico.
• Installation of flooring implies acceptance of
materials. com/commercial/installation
• Inspect each tile for visual defects before installing.
• Acclimatise Amtico products, adhesive and subfloor to
• Installation of flooring implies acceptance of
a stable condition between 18°C - 27°C (64°F - 81°F) for
materials.
a minimum of 24 hours before, during
• Acclimatise Amtico products, adhesive and subfloor to
a stable condition between 18°C - 27°C (64°F - 81°F) for
a minimum of 24 hours before, during